ML19220C420

From kanterella
Jump to navigation Jump to search
Lists Fuel Handling Test Procedures Required for Mode 2 Operation That Cannot Yet Be Completed.Recommends Deleting Hold Status of Fuel Handling & Evaporator Items in Mode 2
ML19220C420
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/16/1978
From: Shiezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Vassallo D
Office of Nuclear Reactor Regulation
References
TASK-TF, TASK-TMR NUDOCS 7905010250
Download: ML19220C420 (2)


Text

.

j -

O i

i f

1 ^. '

U t

i itarch 16, 1373 I

i Ocnenic B. Yassallo. A/D for Ugnt 'ister Reactors, MR HE.-G/dixt FOR:

J. H. Sniezet, A/D for Field Coordination. DROI, IE I

FRCH:

CO GITIQns FOR E!!TERIhG CPERATIO"AL MODE 2 CD:TAIN SU3dECT:

I3 OPERATIn3 LICraiSE 0FR-73, THREE MILE ISI.Xi]

WCLEAR STATIC.1. CIT 2 attac2:=ent 2 to CPR-73 requires completion of certain Test Procedures I

Due to ccaditions now (TPs) prior to entering Operational Moda 2.

l existing at the facility, cartain of these TPs cannot be coa:pletec at this time. These IPs and their status are as follows:

j Tim test TP 120/5 Speat Fuel riandling 3 ridge Functional Test.

The load test was not is completed except for a load test.

i perfor.:cd due to tna lifting cable tcing dA= aged during A new cable is on order. Technical Specifica-

'I construction.

tions require a load tast ba conducted prior to each use.

Tw IP 120/7 Auxiliary Fuel Handling Bridge Functional Test.

The lead test was tast is ccepleted a:capt for a load test.

This I

not performed due to the test fixtura not being ready.

h bridge is nov bridge was not used for initial fuel load.

located at the souts end of the refueling canal and cannot be moved to the norts end for tasting due to the reactor vessel Technical Specifications require a load head being in placc.

test of this bridge prior to aach use.

l TP 120/3 Fuel Transfar Systen and Miscallaneous Functional Tests.

Tl These tests are completed with the exception of electrical travel interlocks c the overneaJ cranc. These intcriccis are currently being designad. Hechanical stops r. ave been installed Technical Specifications in the place of electrical in'eriocks.

~

require. those electrical interlocks or nachanical stops to oe in place or functionally tested prior to eaca use.

}

CONTACT:

G. R. X11asler (492-0013) i c.- ~

e, nL UJs gi 7

~~.

i

\\

790501o M 6 P

~,

e

.or.:aa:c.:. Yassallo Marcii is, 1 JJ TP 220/3 T4 Was:.r Eys; orator Functional Test. This : cst P.as not

,aen s tartca.

Ica eva,: crater wce manale ass asen recoved far ese la :,uf t 1.

A tw tua t.cnale aa; teen crure).

Cn1t f is carrsatly peccassing radioactin fl ids far Unit 2.

Trits, TP can t:e cons.:ctad at i lat.2r date ;:Fior to taa ::rocessing of radioactivs fluids la Cat: 2.

Owz to the Tecnr.ical S N cification require:aots to test tne fuel handlin?

equips.:n: priar to Gs2 saa the sollity to tast t:e Unit 2 cys' rctor A

prict CD ase ca rsJicactive fluids. IE re:mncs tuat these 1 c:s da dalet:4 as oold itr.s for ectaring 0;erstlo.ul.bda 2.

/5/

J. II. Snia:2k, A/O for Fictd Coordinacica Divistoa of Reactcr Operations r

Ie. spec time. I:.

cc:

3. H. Grier, ill DISTRIBUTIO:t:

IE File IE Rdg.

ROI Rdg.

AuFC C. iron.

GRX11 ogler G, 7 b Je u

FC:ROI:IE ADFC:ROI:IE Gidlingler:LJ Jnsciezek.