Responds to NRC Re Violations Noted in IE Insp Rept 50-320/75-02.Corrective Actions:Cable Ends Stored Outdoors Sealed & Cable Reels to Be Stored in New Structure
ML19220C409
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/18/1975
From: Arnold R
Metropolitan Edison Co
To: Robert Carlson
NRC Office of Inspection & Enforcement (IE Region I)
Shared Package
ML19220C408 List:
References
GQL 947, GQL-0947, NUDOCS 7905010170
Download: ML19220C409 (4)


Text

s i.,__-.-

AP **ll:.%]

a.....

,, =,,

n..,-,...,,

/ METROPOLlTAN EDlSON COMPANY cuwarany or at:.enn rusuc uriurits concORATiC.V ST OF FICE BOX 542 RE ADING. PE NNSYLVANt A 19C03 TELEPHONE 215 - 929-3C01 April 18, 1975 cqL 0%7 Mr. Robert T. Carlson, Chief Reactor Construction and Support Branch U.S. Nuclear Regulatory Cc=:nission Of fice of Inspection and Enforce =ent - Region 1 i

631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Carlson:

Docket No. 50-320 License No. CPPR-66 Inspection No. 50-320/75-02 This letter.and its enclosure are in response to your inspection report of March 17, 1975, concerning Mr. Folsom's February 20-21, 1975, inspection i

of our 'Jhree Mile Island Nuclear Station Unit 2 and the findings thereof.

Sincerely,

R. C. at old Vice President RCA:RSB:pa File 7.7.3.2.2/20.1.1 i t.

e.),

e n-

+..,

,(

uced I

790501 0/76

~

Metropolitan Edison Company (Met Ed)

Threc }nle Island Nuclear Station Unit 2 (TMI-2)

License No. CPP'-66 Inspection No. 50- 20/75-02 Response to De-ription of Apparent Violations Apnarent Viol.ilon lA Critarion V of 10CFR50, Appendix B, states in part " Activities affecting quality shall be prescribed by docu= ente; instructions, procedures, or draw-ings...

....and shall be acco=plished 12 accordance with these instructions,

procedut?s, or drawings".

Centra;y to the above, certain power and control cables stored outdoors on partia31y filled reels, were not protectively scaled in accordance with vendor-supplied procedures.

Corrective Action Taken A detailed investigation of the reel storage yards, ce=pleted on 2/26/75, disclosed that 12 reels had cable ends that were either not scaled properly or were not sealed at all. Ic=ediate corrective action consisted of issuance of United Engineers and Constructors (UE&C) QC Non-Confor=ing inspectica Report No. E-11,567.

By 3/4/75, the cutting of f and scaling of the cable ends was cc=pleted, and reinspected by UELC QC Dept. ; satisf actory report CE-ll,569 was issued closing out Non-conf orming Inspection Re' ort No. E-ll',567.

p Corrective Steps Taken to Avoid Further Violations The cognizant Craf t Superintendent and Supervisor have been instructed and nade aware of the need to keep cable ends sealed as stated in current electrical procedure. A supply of cable end sealing caps is on hand for current use, with an additional 6000 on order for future use.

Date That Co=oliance Will Be Achieved Compliance was achieved on 3/4/75.

, Apparent Violation 13 Criterion XIII of 10CFR50, Appendix B states in pact " Measures shall be established to control the handling, storage, shipping, cleaning and preserva-tion of caterial and equipment in accordance with work and inspection instruct-ions to prevent damage or deterioration".

Contrary to the above, certain asbestos-braided instru=entation cables

(

were stored in areas unprotected from rain, snow and ground water.

m r'D

,3 v.) v g,

9, Corrective Action Taken A detailed investigation of outside storage of instrumentation cable recis wan conducted on 2/27/75, and it was disclosed that (1) one-half of the structure had a wooden cicvated floor and the other half had an carth floor, there is a rcof, but no sides, and all reels located around the periecter had been exposed to direct rainf all, and (2) a total of 13 reels covered with tarpaulin were in contact with cud.

It=ediate corrective action consisted of issuance of UE&C QC Non-Conforming Inspection Report No. #E11,568.

All cabia recis centioned above as being stored on the carth have been =oved and temporarily stored on a platform and all such reels are covered with a tarpaulin.

Correcti';e Steps Taken to Avoid Further Violations To avoid future violations, a new structure is being built, with a raised floor, roof, and three enclosed sides.

Upon co=pletion of the structure, instrument cable reels will be coved into the new structure.

Date That Ccroliance Will Be Achieved Co=pliance will be achieved by May 30, 1975.

Apparent Violation 1C Critation XV of 10CFR50, Appendix B states in part " Measures shall be established to control materials, parts, or cc=ponents which do not conform to requirements in order to prevent their inadvertent use or installation.

Contraqr to the above, several reels' of non-conforming (scrapped) cable

. was among reels of accepted cable with nothing in evidence to identify the cable as non-conforming.

Corrective Action Taken Non-confor=ing items have been separated from conforr.ing ite=s.

Corrective Steps Taken to Avoid Further Violations The following corrective steps will be taken to avoid further violations.

. UELC was preparing three areas for cable storage at the time of the audit:

Area No. 1 UELC has a yard layout which will result in placenent of power cable to the north end of the yard and control cable to the south.

Area No. 2 This yard vill be used for storage of instru=entation cable.

Shelters will be re-located from Unit 1 cable storage area to this yard.

Area No. 3 This yard will be used for storage of cocpatible cables I

(Unit 1 cable transferred to Unit 2).

The types of cable will be power, control, and instru=entation cable, all of which will be

{

segregated within the yard.

qt O

,s) i L.

va

  • e

=

t Rejected recic in any of the above centioned areas will also be placed within a separate roped off area, Date 'Ihat Compliance Will Be Achieved _

s Full cocpliance will be achieved by May 30, 1975.