Forwards Position on Section 13.1,13.4 & 13.6 of Fsar.Qa Section (17.2) Complies w/10CFR50,App B & Is Acceptable for Plant Operation
ML19220C178
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/12/1975
From: Vollmer R
Office of Nuclear Reactor Regulation
To: Kniel K
Office of Nuclear Reactor Regulation
References
NUDOCS 7904300026
Download: ML19220C178 (3)


Text

/

?

DISTRIEUTION Docket Files

..p -

QA Rsading CEB e -

NRR Readin;;

Eocket 'b.30-320 K. Kniel, Chief, Light Water Reactors Branch #2, RL REGULATORY STAFF POSITICf3: IIiREE MIII ISIA'O ?UCLEAR STATION, U'iIT 2:

QJALIIY ASSIM' ICE, CCaiCI' G CPERATIO?E Plant Na:::e: Tnree Mile Island Nuclear Station, Unit 2 Liccasing Stage: CL Docket.'mber:

50-320 Fesp nsible Brarr.h: LhR 72-2 PIuject Manager:

B. Washburn Requested C:c:pletion Ihte: February 14, 1975 Review Status: Awaiting Infor:::ation He Quality Assurance Branch has co=pleted its review of Sections 13.1, 13.4,13.6, and 17.2 of the FSAR (through A ad:sent #22) for Tnree Mile Island N2 clear Station, Unit 2.

The Quality Assurance Section (17.2) cceplies with the requirements of Appendix B to 10 CFR Part 50 and is acceptable for the operatica of the Ihree Mile Island }bclear Staticn, Unit 2.

Our positions for Sections 13.1,13.4, and 13.6 are enclosed.

/

f;. (3taiv Richard H. Vollmer, Chief Quality Assurance Branch Divisicn of Reactor Licensing

Enclosure:

As stated cc: w/o enclosure

'r.

C A. Gla=busso

//'

W. 5tDonald w/enciesure S8 i03 F. Schroeder R. necker B. Washburn R. ShDe n t:

D. Skovtrit D. Eisenhut R. Vollner A. Garland V. > bore G. Reimnth J. Gilrav

. ~'rrrh:rg(:'

S. 'J m

".."I :spcch I

QAY.;yj,__.RL:$.3 __.-.RL:QA RL:QA RL:

.,c,

g,,.

JGilrav:do R>t FA11enspach.

RVd11mer 4

...m.

2/11[f5 2/ DS p

2/// /75f ~:/g/75 '

~

Form AEC 318 t Re. 9 55) AECM 0240

  1. w me eovenmusav paiemme o,.ic us e s,4. s s.i.4 7 9 0 4 3 0 0 0EC

W fr:

a, r_a. _ _1 410.0 CUALITY /.S R U_':CZ 3?X~Ci!

412.1 Ycur answer to Question 11.2 does c.a t provide ad2quate (13.1.1. 4) information to de termine the of f site technical capability w'aich supports the operation of the Three :Ille Island. Unit 2 facility.

Provide the following informa: ion for the functional units of

bnager-Genera tion Engineering, :enager-Genera:ica Operations, and :'ana;er-Generation "aintenanca.

Exclude those persons directly accigned to plant staffs.

(1) A breakdmm, by nu-bars and qualifications,of the engineering and technical staff assigned to each of these functicual 31ceks.

Include for each technical staff a tabulation of their educational bach;rcunds and experience, particularly in those fields (e.g., reactor physics, reactor operations, radiation pro tection and radiochenistry) unique to nuclear f acilities.

(2)

A resure of the qualifications of the managers of each of these functional unit including their educational backcround and a sunnarv of their e m H.ence.

(3)

An estinate of the proportioned tica available for each of these technical staffs to work on the Three ' file l

Island Units 1 & 2 in view cf the many other plants for which they provide Occhnical support.

412.2 Uoda te Sec tions 13.1.2 and 13.1. 3 and Fizure 13.1-1 (13.1.3) to clarify and/or correct information relative to changes to your plant staff =ade in Amendment /22 to your FSax.

For exa ple:

(1) Sections 13.1.2 and 13.1.3 do not provide a descriptien of the functions, respcasibilitics, authorit:., and the qualification requirenents for the positions of Shift Supervisors, Suparviscr-Chenistry and Health Physics, and Supervisor Training shown in Figure 13.1-1.

(2) Sections 13.1.2 and 13.1.3 provide descriptive inf o rmation relative to the positica of Iastrucent and Cancrol Engineer. This position is not shown in Figure 13.1-1.

412.3 (;SP)

Your descriptien of the qualificatiens of the person assi;ned (13.1.3.2) to the positica of Supervisor of Operations, Uni: 2,does not indicate tha: this individual has an" experience in nuclear pcuer plant operation.

t:e require that the persen assi;ned to this position have, in addition to other requir2nents, at leas: one year of nuclear power plant coeratin' exterience.

b

i.

O

~

FEg 12 'i575 410-2 412.4 (2SP)

Ycu state in Sectica 16, Part 6.1.6 that the " Control (13.1.2.3)

Ecca Operators shall obtain an AEC Eeactor Operator's License prior to ccepletion of the power ascension testing ptogran of the initial startup," and indicate in note 2 of that sectica that you may not meet minitun shift crew cc=positica at the time of initial fuel loading.

It is our position that as a mini =um the shift crew composition (one Senior Licensed Operator, two Licensed Operators.and two. Auxiliary O' era tor s) described in Secti:n 13.1.2.3 of your FSAR be met at the time of initial fuel loa din g.

  1. 1, O

(,-,)

Y:u state in Sectica 13.4.2 tha t the provisions for r2 view and (13.4.2) audit of plant operations are described in detail in Section 6.1.9 of your proposed Technical Specifications. As you are aware, the staf f is currently reviewing stoposed changes to your Three Mile Island, Unit 1, Technical Specifications relative to the provisions for review and audit of plant opcratisns.

It is the staff's posicicn Gia; you c oage the review and audit section of the Three 5111e Island Unit 2, Technical Specifications, to conforn to the forthco ing revised Three Mile Island, Unit 1, section on revieu and audit.

e 6 [\\ v -