ML19220C122

From kanterella
Jump to navigation Jump to search
Notification of 750529 Meeting W/General Public Util to Discuss Questions from Matl Engineering,Mechanical Engineering & Radiological Assessments Branches
ML19220C122
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/23/1975
From: Washburn B
Office of Nuclear Reactor Regulation
To: Kniel K
Office of Nuclear Reactor Regulation
References
NUDOCS 7904280272
Download: ML19220C122 (2)


Text

.

S t

UNITED STATES NUCLEAR R E GU LATO R Y CCMMIS$1CN W AsHINGToN. O.

C.

20555 Docket No. 50-320 Stay 23, 1973 Karl Kniel, Chief, Light Water Reactors Branch 2-2, DRL FCRECC5 TING MEETING NITF StETROPOLITAN EDISON CCMPANY --- TEPIE 51ILE ISLAND NUCLEAR STATION, U'!IT 2, (BII-2)

Date and Time:

Thursday, May 29, 1975 10:00 A51 -- 4:00 PM Location:

Roo 435 Bethesda, Md.

Purpose:

Discussion of 'taterials Engineering,

Stechanical Engineering and Radiological Assessment Branch Questions Participants :

GPUSC: J. St. Vann, e t al NRC:

B. Washburn R. Kiessel H. Silver R.

Lessler V. Gael J. Potter H. Conrad

//

/ hY

.. Washburn, P ro '--: Manager Light Water Reacton Branch 2-2 Division of Reactor Licensing

Attachment:

Agenda jsu?tCS p

Q Yb

/

.? c4' y E a

O., #

\\

I? s. A

  • j l !l

?

T 79012807'72

AGENDA

_MAY 29, 1975 I.

Materials Engineering 1.

RT values for reactor vessel materials (12. 3)

NDT 2.

Vessel material surveillance (12.1) 3.

Pu=7 flywheel inspection (12.5) 4.

Tests anc inspection for Class 2 and 3 systems and components (12.3) 5.

Steam generator tube inspection (12.9) 6.

Reactor coolant chemistry surveillance (120.0)

II.

Mechanical Engineering 1.

Postulated pipe break locations (11.1, 11.2) 2.

Pre-operational inspection and tt s s ( 11,. 7) 3.

Applicability of preposed code revisien (TR-120) to B 31.1 and conformance to acceptable design criteria in R.G.

1.67 (11.11) 4.

Tabulation of all active Class 1, 2 and 3 pumps and valves 1nd associated operability assurance program (11.12) 5.

Shock and/or vibration tests (clarification of response to 11.15 and 11.11) 6.

Operability assurance of active valves in the RCP (11:13)

III.

Radiological Assessment 1.

Solid waste storage drum espping and personnel expcsure (33.3) 2.

Occupational exposures for the health p:.ysicist and radiation protection personnel during re-fueling (33.11)

Note:

(XX.X) refer to first-round questions previcusly submitted to applicants 87 275

__