Responds to NRC Re Violations Noted in IE Insp on 730723-25.Corrective Actions:Equipment Has Been Lubricated & Procedures Reflect Preventive Maint Program
ML19220C092
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/11/1973
From: John Miller
Metropolitan Edison Co
To: O'Reilly J
NRC Office of Inspection & Enforcement (IE Region II)
References
NUDOCS 7904280219
Download: ML19220C092 (4)


Text

.

~ ~ ----

/

/,

4'. / j m.a ; i m ',,r i

.7 m /~

/

%,m%

/

.,/

(

('

'}

mas --M Y ?.4

/

,. u m.. w w

/

/

/

/ METROPOLITAN EDISCN COMPANY

.- <,.m, c c ~,. o o....,_

re.-

/

i PCsT OFFICE BOX 542 R~ A Cl!!G. PE!.NSYLV A.* l A 10603 TELE?"O'E 215 - 029 2C01 r,._- we__ _ _, _ c m.

r Mr. J. :es ?. O'Reilly Director of F.egulatory Operations United States Atemic Energy Ce ~issica Regicn I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Three Mile Island Nuclear Static Unit 2 Docket No. 50-320 AEC Audit Findings

Dear Mr. O'Reilly:

This refers to the AEC/D.'.0 inspectica cenducted en Julf 22-25, 1973, and the findings which appear to be in violatica of AEC require-cents as discussed in the July 25, 1973 Exit Conference and delineated in AEC letter dated Septenber 7,1973.

The attach ent centains cur respense to those findings, a dis-cus. on where applicabic, and a statement regarding implecantation of corre tive acticn.

Very truly yours, 1 -

/

l

,*Q>

f.

i

/*

Q.

0

/

'J. G. Miller Vice President

/l brh j

Attachment ec:(with attachment) Mr. H. M. Dieckamp Dr. D. F. Knuth Mr. W. A. Verrechi 4 $

~

\\E 7904280 d

.ei

.6,..

  • L,..,.~..-

1.

EF.C Findint: Criterien ',', Appendix 3, ICCFR50, states in part, "Activi-ties affecting quality shall be prescribed by documented instructicas, procedures, or drawings....and shall be accerplished in accordance with these inctrue:icnc, pr:cedur2s er drawings."

b)

There was no decurentary evidence that Makeup Sys:ce Pump; MU-P-la and 13, stored in place in the Auxiliary Suilding, had been periodically rotated and lubricated.

This is required by 35'J Field Specificaticn FS-II-1, UE5C Nuclear Construction Precedura NCP-1-2 " Installation of Nuclear Auxiliary Purps", and UESC QC Procedure QC-3-2 " Storage Control".

Discuscien:

Failure to pr:perly raintain safeguard equipment had previcusly been identified by AIC inspectors in March, 1973. As indicated at that tire, a Preventive Maintenance Progrc with check lists was to be implenented by the Engineer in August, 1973 as corrective sc:ica to the proble cf ineceplete equipment lists and =aintenance require:ents.

Corrective Action:

1.

A Preventive Maintenance Program with storage records for the subject pumps was placed in effect at the sita on September 5, 1973 and both pumps were rotated and lubricated on September 6, 1973.

2.

NC?-1-2 has been revised to reflect the Preventive Maintenance Progran as being the governing document for maintenance during storage. Sl-

\\ H )<

r

2.

DFS Finding-Criterion *lII, Appendix 2, 100FR30, stacca in part, "Docu-

=entary evidence that caterial and equip:ent ccafer: to the precurc cn requirements sh:ll be availabic at the raclear power plant site pricr to installation...."

a)

Site direc:ive QC-17-2, Revisica 5, dated April 4, 1973, permits

" conditional installatien" withcut definin; the ccnditiens under which it is permit cd.

Discussion:

UEaC QC Procedure QC-17-2 states in part that iters which are tagged

" Hold" or "Rej ect" cay be released f or purposes of relccatica, rework, testing, evaluaticn, conditicnal installatica, or any operaticn which is deened necessary by canagement perscenel. The design centrol ceas-urcs assured by this site group are inadequate in that this group with unlitited release authority does not qualify as the organica:icn respens-ible for the original design.

Authorication to install or use any "Rej ect" cr " Hold" iters is at variance with per: ices of 1CCFR50.

This requires that docu:entary evidence that the caterial and equipment confor: to the procurement requirements shall be available at the site prior to installa:len or use of such naterial or equipcent.

Corrective Action:

' ESC QC Procedure QC-17-2 is currently under revisien to correct J

these findings.

't is anticipated that these changes will be in effect by Neve ber, 1973.

The proposed revisien will require that equipment ite=s that are tagged

" Hold" or " Reject" may be ccnditionally released. The specific lixitaticas for this release will be identified on a qualificc release form. The required level of =anage en: and technical approval to irplement a quali-fied release will be specified in QC-17-2.

eq

=?

8/

n-

b) The Quality Assurance Data Sheet for safeguards pump "U-?-1A did net incorporate the 13 Furchase Order Change "otices applicable to the equircent.

Discussion-R&W Precedure NFG-1711-C: which covers the preparatice of Quality Assurance Data Sheets o.rovides that the QA Data Sheet is to be revised

..' c.... ~.... ' s - a e ~

. e.' 1 e c ~.

m-e p '.' ~ % ' c '. c". '. '.' c. m-

~ o ~. ". e i'.'.e~,~..o.'.

purchase order, i.e., applicable change crders.

In the case of this purchase order, the QA Data Sheet was revised in fulfill:ent of this precedure en August 17, 1972 after the issuance of all change orders.

The Data Sheet was then approved by Quality Assurance as a valid state-cent of the documentation required.

In taking this approval, 3D.* Quality Assurcnce was subject to their procedure No. 19A-4A whic*.. requires in p2rt that Quality Assurance review each purchase order change. The Quality Assurance revicw of the docu:entatica package was then cade against this valid state:ent of required dccumentatien. In initialing the sheet alcng-side each ite of required decurentaticn, the reviewer attested that the documentation was in accord with the statement of required decurcntaticn.

This sign-off is indicated en the sheet as August 29, 1972.

Corrective Acticn:

It is considered that 35W's (SSSS Supplier) procedure for handling change

~

notices to purchase orders is adequate and ne corrective action is neces:ary.

_ p

,4 8/

Y

..cu DaTE OF COCUM E NTi Daf t.E

  • ti v t3 150.

1U/11/73 1C/17/73 310s:

12T',CPGLILI. DIOfl CGL cr a.

g.,

...c.r i

'O o.i a i CO.

O TH E.-

NO ( TJC?JGCd )

.J

e ~e u.. ~ce

_ c a ri ~.w a. ro

e. arte = r:unn w

.e ie.. :en.n

e..,r av.
u.. :.

mer 2,.ic

,s

o:a.

i U

l

.3

~o.

..c..

io~ w

e. w. t.c

..... r a ec, i

  • ti

.r:.vro av

et ACC,'. CIT FL* 0I' CS t,C.i,Cu l!.T CC:. TAU.U.C CCa FIS?C.SE TO D22n T.EE FU DII.GJ, KS Jr.i!D.T.J.T : IC,to-i i

U.G ETLDJliI.'.IICti CF CLCM'.T i4 TIC.}

- l 1

e c:c...

-(

/.&

i Is i

fe% __.

a~

( -.. l

'I

/

/

,l.

r at 's j

I t

l

'q

. [,,

f r GL J,"

... n s.

l f

f

\\

,f y.

1 CCPY SZ T TO FICICD I.

/. '

Mall CONTROL FORM m.= ac.e, i

u s. Arewie cNanov couwissicN c.

"OV E. Nut" ****'NG OFF CE '973-SO3'3S gy5 e

p 1

8/ IC

_