Voss A. Moore, Assistant Director for Light Water Reactors, Group 2 Division of Raaetor Licensing METRDFOLITAN EDISON COMPANY, THREE MILE ISLAND, UNIT 2 (OL), DOCKET NUlf3ER 50-320 (Q-2)
Flant Na:sa Three Mile Island, Unit 2 Suppliers: Babcock & Wilcox; 3 urns and Roe Docket ihmber: 50-320 Responsible Branch and Project Manager: LWR 2-2; B. Washburn Requested Completion Date: March 28, 1975
' Description of Response: Questions - Second Round (Q-2)
Review Status:
Infor=ation Requested T # ration submitted by the applicant in the FSAR has been reviewed by the A;,;1,1 cations Section, Materials Engineering Branch, Office of Nuclear Reactor Regulation. Adaquate responses to the enclosed request for additional infornation are required before we can co=plete our avaluation. In order to =aintain the current schedule, the applicant should respond to this request by June 27, 1975.
R. R. Maccary, Assistant Director for Engineering Division of Technical Reviev Offica of Nuclear Reactor Regulation
Enclosure:
Materials Engineering Branch Request for Additional Infor=ation (Q-2) cc v/ encl:
V. S. Goel S. H. Hanauer H. F. Conrad F. Schroeder A. G1nmhusso DISTRIBUTION:
~
W. G. Mcdonald Docket File (50-320)
S. Varga L Reading File K. Kniel MrE3 Files R. Washburn S. S. Pawlicki W. S. Hazelton R. M. Gustafson 7 9 0 4 2 8 0 OG6 6 0 7 7.2
\\
NRR:MTE3, NRR:MTE3 NRR:rE3f, Q 7--
~gM-
.,,,c.,
f
_HFCenrad:eb RMGustafson.
_SSPy,
RR..ac ca g__
.gi
_3]3/75 3 hf/_75 3//fd75
_3/l4/75 sar=
- Tom A2c-519 (RJv. F$D AZCd 0240
- h. a. eovs s =m a ny pe sevene o r
- C u i s?.. no.s ee r
ATTAC10:I';T 1 REACTCR CCOUJ;T C*ICSTRY r
Aeolicability: Applies *o the periodic surveillance of the reactor coolant che:istry.
Objective:
To assure specified coolant chenistry li=its are
=aintained by periodic monitoring of coolant thenistry conditions.
Soecification: The following reactor coolant chenistry analyses will be
=ade:
Analysis Frecuencv Crygen Prior to heatup above 250*F and 5 times per week Fluorides 5 times per week Chlorides 5 ti=es per week x
, ty V)* E}
}
'. s th
122-1
---,... S.,. v-,t.. c :. c. i.~
-,...c
-.,v... C.a.
1.3,0
.u.A u3...., a, m. r,t c -. 7,.. -
33
-. C,. C.........u.. _ u.
a _..
v ar u.s..a 122.l(RSP)
The Technical Specifica:1cn for Reac cr Cecian Che istry cust contain provision for the frequency of periodic surveillance of the che:istry 11:1:3. Attachment 1 is an example of an acceptable specificati:n.
\\
g e.
g-S
. 1
-.s i k