UNITED STATES NUCLEAR REGULATORY CCMMISSION W ASHINGTON. D.
C.
20555 April 5, 1975 Oceket No. 50-320 K. Kniel, Chief, Light Water Reactors Branch 2-2, ;
STATUS OF APPLICANTS' RESPONSES TO CUR RZ;UESTS FCR ADDITIONAL INFCPJ.*ATION---THRIZ MILE ISLAND NUCLEAR STATION U'iIT 2 (TMI-2)
The enclosed tabulations update the status of the applicants' response to our requests through second-round.
It should be noted that the responses to the Auxiliar/
and Power Conversion Systens 3 ranch first-round questions were conpleted April 4, 1975.
This is eight weeks earlier than was projected in the applicants' letter received :,iarch 14, 1975.
The review schedule for this branch should be appropriately revised.
l Cf'9fA *'
- 3. W. Washburn Project Manager Light Water Reactors Sranch
-2 Division of Reactor Licensing Snclosures:
1.
Status of Applicants' Respense to First-round Questions--Supplenent 5, April 5, 1975 2
Status of Applicants' Respense to Second-round Ouestions, April 5, 1975 Distribution:
See attached p "
- g 7 9 0 4 2 7 0 6 ~Ko 84-089 76 19N
'/
/
I
April 5, 1975 Do c ke t.';o. 50-320
.3._
.m
--am-
,s-f =r r m 9 7-t s et.m 7 ; tT c.A..
.e v i e...
U...,T.;.;.
...r;
-. D L.A. 4 J, 4vv a.4 s
- b...,,.0,.4 a - - - - -
.0 cr,C..
Ro3....
. ra.2 0
A r.,-.. C Ao.., a-, R a Co.--as s
S,. a, e n. a-
.s.,-
r a.
(.Tollowing submittal of Amendment 26, 4/4/75)
R rC,,D,A.iu R.' w-...,,
VLa.
.a
- 4. L,. :.R A.,.,....,
4.
c 0.
.-,.. a
-.ar01.,dr Sm.a.n.1-..a v...:..
. l,u...a R
tc:
r a
Sm;".. a : o..n *. 4 (i.;
a *
-v
.. a _
- T_"; 3, m R ?n* m. -.".. ?.
Draft Q-2's due to lei on 4/11/75 Al~i!LI ARY AND PCWER CCNVERSION SYSTEMS 3RANCV Apelicants' response to ;-l's was completed 4/h/75, S weeks earlier than Projected in applicants' letter received 3/14/75 Current review schedule requesting draft
- -2's by 6/13/75 should be improved; this is the critical path in the current review schedule.
Draft Q-2 date should be im-proved to 5/16, the latest date for 4 other branches, or to 5/30 at the latest.
CCNTAIN%ENT SYSTE:'S 3 RANCH Draft ;-2's due to L.M on 4/11/75
, Ctr A".4. c k ?,
- .
- r r s. I: o. r. v.
- c 2 Itbi U. -~u
. r s
L 4
v 24 J
Draft 0-2 's due to LE: on 5/16/75 r.ax. mru..r. A r - :. IG T..,rr.R r u, r 2 2ls Cu..
ma -
. a 4
Draft ;-2's due to LE' on 5/16/75 3 m. Rt,C.1Ja. L r". c
- s. Lern... v.,G : o. l <.Cu..
v n
Draft ;-2's due to L?M on 5/16/75 REACTOR SYSTE','S 3 RANCH Applicants' response due 6/27/75 e..". D C v..,o,.C a v_ e.. a-2,.. nu..
- - c prc.x..
... -, o....
- v.. e A,.. C,.
_..m..
e
..... ~..
Draf t ;-2 's due to LE' on 4/11/75 c m R
=. =R=. C o. u...,,c = : p A v. e u
-v
.~....-
241.1 26 Responded; test progran is continuing Open Items:
None 84 090 April 5, 1975 Decket No. 50-320
SECCND-ROUND QUESTIONS------
em.,v.-
3:w fV.4 n.J A.e J
,em.
.L g 6 e *
.w
. ;. 0 0..0,
.s.'.T a..f N.LO* ' m.
'~
s
- i'Z.3 E?,
RE MONSS STATUS /CC:Cl.ENTS ACCIDENT ANALYSIS 3 RANCH Applicants' response due 6/27/75 SITE ANALYSIS 3 RANCH Draft ;-2's due to lpm cn 4/11/75 RADIOLOGICAL ASSESSMENT ERANCH Draft ;-2's due to lpm en 5/16/75 OUALITY ASSURANCE 3 RANCH Applicants' respcnse due 5/23/75 INDUSTRIAL SECURITY AND E:,IER3ENCY PLANNING 3 RANCH 42.10 25 Responded 42.11 25 Responded 42.12 25 Responded Open Itens:
None (Request for revision of site security plan has been subnitted for concurrences; applicants' response is expected in June 1975.)
CpERATOR LICENSING 3 RANCH 431.1 25 Responded 431.2 25 Responded 431.3 25 Respondad 431.4 25 Responded 431.5 25 Respended 431.6 25 Responded 431.7 25 Responded 432.1 25 Responded 84-091
e
-3 April 5. 1975 Decket :io. 50-320
SECC iD-RO U:iD QUESTIONS-----
REQUEST RESPC:;OI::G m....-,,.,
.it.v R
- s. a..
NU'GER RESPCNSE STATUS /CO:/.'.:E'iTS 432.2 25 Responded
(::cTE: Response indicates that administrative procedures will hg revised.)
432 3 25 Responded 432.4 25 Responded 432 5 25 Responded Open Itens:
None 134- ()4N
~
O April 5, 1975 Oceket No. 50-320 THREE '/.ILE ISLAND NUCLEAR STATION UNIT 2 STATUS OF ApFLICANTS' RESPCNSE TO FIRST-ROUND ;UESTIONS-----
Supplement 5 - (Following submittal of Amendment 26, 4/4/75)
RE;UEST RESFCNDING NU:'3ER Ay2NC/.ENT NU'GER RESPONSE STATUS /CO:C/.INTS GENERAL 26 Reviced Figures: 1.2-3 thru 1,2-20 and 1.2-25 thru 1.2-30.
- t."u ;v. m..
?_ R r_s. e.ers.'m.
S v. e e ;".s S r_, pl s.t e'.,,,'.
em
.u Open Items:
None AUXILIARY AND POWER CONVERS:CN SYSTE:fS 3 RANCH 02.14 26 Responded (Revised the previous response in Amendment 22).
02.19 26 Res;cnded (Revised and expanded the previous response in Amendment 23).
02.22 26 Respended 02.23 26 Responded (Referenced response to Question 02.19 above).
02.24 26 Revised Figure 2.24-1 previously filed in Amendment ?.1.
02.56 26 Revised previcus response in Amendment
- 22. (Revised Figures 9.4-1,-3, 5,-6,-7,
- 6, and - 9 ).
02.62 26 Revised previcus response in Amendment 23; provided revised HVAC drawings listed under 02.56 above.
Open Items:
None CONTAIN?.IENT SYSTE:/S 3RA: CF 03.10 26 Responded (Respense _s incomplete; did not provide analysis of the differential pressure for the R.3.
fan cooler hcusing and ductwork including design pressure and transient pressure).
Open Items:
Response to ;-03.10 is inccmplete; ;-2's should address tnis.
84~093
. April 5, 1975 DocP.et No. 50-320 RI;UIST RES?CNDING As.......
s....,: R
.:.w...:
s e u..w NU:3ER
?.ES?CNSE STATUS /CC:4:G.'iTS
- .., -. u.. r. R 7,. - n..A.4 0.a.
.~
.,,,..A,.,,.y. um e.. u _
..n u
11.3 26 Responded 11.10 26 Revised the previous response in Amendment 25.
11.11 26 Responded 11.13 26 Respended Ocen Items:
li.5-Premised 5/30/75.
IMTERIALS ENGINEERING 3 RANCH 12.4 26 Revised the previous response in Amendment 24 Open Items:
12.3-Premised 5/30/75 12.10-Premised 5/30/75 12.6-Revised, ex anded response was promised 4 4 in meeting on 3/6; current promise is 5/30/75 12.9-Inservice inspection of steam gen-erator tubes needs staff position.
STRUCTURAL ENGINEERING 3RANCF 13 3 26 Responded; needs evaluation.
Open Items:
Ncne REACTCR SYSTE:45 ERANCF 21.18 26 ATWS: Response indicated that 3&W topical reports, 3AW-10016? and 3AW-10099, had been submitted.
Earlier resconse was submitted in letter dated 2/14/75 Open Items:
ATWS--Applicants need to address staff concerns expressed in the 2/27/75 ATWS meeting.
Topical review is centinuing; RS3 should formulate formal questions er positions to elicit applicants plant 84-094
. April 5, 1975 Cocket No. 50-320 R -,,u.- -,.,
R_drCi
.sG O.
.s...
A. 'i s.
.i T u..
R cs.
Rea-C,.<. -
z-,...
C C u...-. e. b
.z.,:..
r z:
- u. u =
.~.
specific analysis and detailed discussion of the applicability and ccnsequences of the generic topical report assumptions and sensitivity analyses in T.MI-2.
(Scoping type of analysis T.ay be sufficient to permit evaluation of the final generic analysis results.)
ECCS--Resconse to ^-21.20 in Anencnent 26 indica'es that review is continuing t
and that applicants are awaiting 3&W reanalysis before further consideration.
RS3 should formulate questions or pcsitions as for ATWS above; safety review scaedule will not accommodate a serial approach as envisioned by the applicants.
II.ZCTRICAL INSTRL".tENTATION AND CONTROI. SYSTE%S 3RANC'J 22.11 26 Responded (Exceptions conformance to R.G. 1.47)
Open Items:
22.11-Conformanc e to R.S. 1.47 is under the applicants; response is review by /30/75.
promised 5 CORE PERFOR'.IANCE 3RANC'J 23.9 26 Amended previous response in Amendment 23; referenced response to follow-up second-round question 241.1 in Amendment 25.
(Amendment 25 did not respond to 241.1; response to 241.1 is in Amendment 26).
Open Items:
None.
ACCIDENT ANAI.YSIS 3RA.','C'J Open Items:
None vi.f
,..,.,,--.%.4g..
e,.,,
A.1."L u. D. O O v."
Open Items:
No:.3 84~095
h-April 5, 1975 Docket No. 50-320
- -. ~,..
..,,1.w
.'b"
< V O Q.,
.400 vai' A.,..,,
4 L.. 2._ 3
. _.. u.
m.
NU'GER RESPONSE STATUS /COM::E'CS RADICICGICAL ASSESSMENT 3 RANCH Cpen Items:
None (Radicactive source, during re-fuelling, sone drawing to be submitted 9/1/75: our requirement for this information prior to the SER should be reinforced in the RAE ;-2's).
OUAI.ITY ASSURANCE 3 RANCH Open Itams:
None INDUSTRIAL SECURITY AND EMERGENCY PLANNING 3 RANCH Open Items:
None OPERATOR LICENSING 3 RANCH Open Items:
None 84~09G