c;cE b' DI W,ISU W J 'J L *' *' f'^ *"J 7 5Entrai Fi1e
[T.,nRR CSAS. NRR Daniel R. Muller, Assistant Director for Envirormental Projects. EL THREE MILE ISLAND - UttIT 2 -- F0Prl,L SITE VISIT QUESTIONS (CL)
PLANT NAME: Three Mile Island, Unit No. 2 LICENSING STAGE: OL MILESTONE NUMBER /3PANCH CODE: 30.75 RESP 0itSIELE BRANCH: Envirorcental Projacts Branch No. 4 CATE REQUEST RECEIVE -
NA REGUESTED COMPLETION DATE: July 11, 1975 DESCRIPTION OF RESPONSE: Transmittal of Fomal Q-1 Questions for Environmental Specialists Branch REVIEW STATUS: Cost-8anefit Analysis Branch Review Complete Enclosed are fomal.'-l cuestions (CL) to the Applicant which are needed to provide information for precaraticns of a DES for Three Mile Island -
Unit E, Occket No. 53-3EC. These questions are based upon our discussions with the App'icant au a recent site visit. Questions were su;mitted by L. Sykoski (C2aS) wha may be contacted for further infomation.
Ocgmis.v.:d:y H.R. Denim Harold R. Dentoa, Assistant Director fo-Site Safety Division of Technical Reflew Office of Nuclear Reactor Regulatd4n
Enclosure:
As stated cc: w/o encl.
A. Giambusso W. Mcdonald J. Pan:tarella SS Ber :h Chiefs w/ encl.
S. Hanac -
F. Schroeder TR Asst. Ci cc. ors G. Margtto M. Spangler L. Bykoski 7904270631
[b - b j
V N /L, 76E
. _ CSA3
_. ADqS o
'a
- Leykoski:cs..nS652gfer.
sacenton -
7/9/75 7/!C175..
-_.1/ \\\\ l75
..r.,
Fwm AIC.318 ( Rev. M3) AECd G240 e, sov a RN M EJe f PMINTm 3 QPFtCal 1+74 818966 D
~
4 Mi' L.,.-
..r, C.i AO Ls*
r c.,... -
b,..,,.,
ail l /_
iw Docket ?!o. 50-340 Cost-Eenefit cuestions to A::licant 1.
Provide an estimate, b/ county, of the loca*.ica of residence of the operating work force of Three.:ile Island - Unit 2.
2.
Provide the amount of taxes (by taxing jurisdictions and ty e of tax) that would be paid on T"I - Unit 2 by tre utilit;. if the plant does not operate as ccposec to the acct.nt Inat aould be paid if the plant does opera:.
Provide assumotions uts; in det rminino tre tax arcants.
Provide a depra:iation scheduie for the plant and its effect on future tax paj :ents.
3.
What cercentage of the t:tal estinated annual expenditures for succlies and raterials related to th2 operaticr of T"I - Unit 2 will be ex: ended locally? Local m2y be defina as an arei including Herrisburg and other ccanunities aithin 15 miles of the plant.
a