Summary of 740718 Site Visit.Examinations of Core Borings Indicates Foundations Are Adequate for Support of All Structures
ML19220B892
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/23/1974
From: Heller L
US ATOMIC ENERGY COMMISSION (AEC)
To: Harold Denton
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7904270601
Download: ML19220B892 (2)


Text

.

~

a.-

JUL 23 w~.;

'.iani. ~. caten..u ais tant 71 rec tor f or Jite S af a t'7 L

'.J -

'Jillir.. I. T.:.ill. O.ia f, Site.inalysis,rane L

3 Carl 3:e p. Chic. Scolo r.7, auis m.c U.

c.d rounda:ica En;;ir.aerin; 5ec tion. 3.G.I.

JI~T VI5!T - T4?ZE MILE ISLUL NUCLE.'a ST.\\TIGn

'WT

.' ia - Occhet 30. Z-2.'

A visit to the above site by the undarsi,med cccurred c :. July l'.

IM '

to inspe : geci pical and foundation anginacrin?. scatur; of the sitc and to discuss Q-1 <1uestions and res;cuses with the ap;licant and/cr his representatives. GPU Service Ccrporatica represcr cd the apoliccat, Matrepolitan Edison Ccopany.

~~he A & Z, Lorns and Nc, Inc. and Gilbert.6ssociates were responsible ror geologica2. aspects along vit Gilberta' consultant. Dr. Mr rin Kaufnan.

Tac nornin:; was devoted to an inspectien of the dike and'Fip-rapped slope adjacent to and between the Category I intake structure ic:

Units 1 and Unit 2.

Failure of these rip-rapped sicpes could in; ede the flew of safe shut down Vater fron the river into these tvo structures.

Care Sorings from holes RS-4(MI) and 2-4 were also inspected: all cores are stored in a varchouse at Harrisburg International Airport. Luring the af ternoon, we inspected a partially open excavation for the air intake structure of Unit 2 and discussed Q-1 questions and responses.

Inspecticn of Core RB-4('CO, drilled during the Unit 1 enploraticn progr2.n to a depth of 120 f t.. indicated that the shale foundstions are adequatr for the safe support of all plant structures. Ecring 2-4, drilled during Unir 2 exploration to a depth of 43 f t. also indicated adequate foundation coMitions for structures founded on shales.

No organic r.aterial was apparent in these corec. although one or two clay seats vere coted.

The rir-rapped dike section between the two intake structures showed scar.e surficial distress in the half next to the Unit 2 intake structure.

In this area, possible eresion and subsidance of the supporting dike r.atetials r.my have caused several low spots and sags to the surface of the rip-rap. The construction sequence of the dike snd cofferdan for the Unita2 intake did not assure that rip-rapped slopes were supported by properly engineered fill. Burns and Roe and Gilbert Associates representatives vill investicate the quality of this fill and vill perform appropriate stability analysia c ' these slopes.

A discussion of the Q-1 questions and responses vill be prepared by the LP". f or this plant.

7904e706c[

bG L. 'i. M ie.-

So11a Enginehr, Occiogy, $eismolo<Jer, add

- Foundatien Engineering-$ertien

..a Site.Analys12 3 ranch L...

w~

g~ *'.,

~4

JUL 0 3 E74 inrold . ?cntm cc:

J. ". Rendri.e A.

Gi rluss:

3

7. '-:oc r e A. :.niel T.

icshburn L. Boracan SS Branch C*ilefs

'*. enne?.e A.

.!CTU (10)

PDR Local PDR J. Shrc se DISTRIELIION:

L: Docket File L:Rdg L:SAB L:AD/ss m

.../

,r p

g[pg__

OFFtCI W E:s-gg,j[_

in ri wan 1{ 3{$

e,<

,_ ac. n. a....,,, u m >:.2 m

.. a,.

_