Issuance of SER Has Been Delayed.Present Schedule Requires Revised SER Inputs by 760420 W/Info Received Through Amend 39.Requests Rewritten SER Sections
ML19220B864
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/16/1976
From: Silver H
Office of Nuclear Reactor Regulation
To: Collins P, Heltemes C, Knight J
Office of Nuclear Reactor Regulation
References
NUDOCS 7904270531
Download: ML19220B864 (2)


Text

a.'

=

UNITED STATES NUCt.E A R R EGU LATO RY CCMMISSION W ASHIN GToN, O.

C.

20555 Docket No. 50-320 March 16, 197o P.

Callins, Chief, Operator Licenaing Branch C. Helte=es, Chief, Quality Assurance 3 ranch J. Knight, Mechanical Engineering Branch S. Pawlicki, Chief, Materials Engineering Branch I. Sibweil, Chief, Structural Engineering Branch P. Check, Chief, Core Perfor=ance Branch T. Novak, Chief, Reactor Systems Branch Z. Ros: toc:y, Chief, Analysis Branch V. Benaroya, Chief, Auxiliary & Power Conversions Syste=s Stanch G. Lainas,

Chief, Contain=ent Systems Branch T. Ippolito, Chief, Electrical Instru= ental & Control Syste=s Branch D. Bunch, Chief, Accident Analysis Branch W. Kreger, Radiological Assessment Branch L. Hul=an, Hydrology-Meteorology Branch TMI-2 SER OPEN ITEMS In recent weeks, the TMI-2 reviewers and I have atte=pted to identify to the applicant all items still open in our review. To a major extent, these have been for: ally trans=itted to the applicant and/or have been discussed at =cetings and in telephone calls.

Recent a=end=ents and letters frc= the applicant have addressed sc=e ite=s.

A=end=ent 39 is scheduled for March 30, 1976, and is planned to cover =any others.

Because of the nu=ber of these open ite=s, issuance of the SER has been delayed. The present schedule will require revised SER inputs, incor-porating infor=ation received through A=end=ent 39, by Aptil 20, 1975.

These should not be in the for= of supple =ents, but rather rewritten SER sections covering only those areas which are changed or added.

Significant slip beyond April 20 =ay i= pact the spplicant's fuel loa < ling date, so it is i=portant that this date be met _.

/

,2b - 1,, a Harley c her, Project Manager Light Wltdr Reactors 3 ranch 12 Divisick/of Project Manage =ent l

cc: See next page 1

i 4

^

790427053I N a?r)O I

i

cc:

B. Bursey R. McDer=ott R. Klessel K. Hoge C. Tan W. Brooks R. Lobel J. Watt P. Hearn F. Eltavila F. Ashe C. Ferrell J. Potter R. Kornasiewic K. Kniel R. DeYoung i

lj b] ' ' ' ' 1...

~^