4 9
Mk; : ^ --
!C13R!dIOUM FOR:
S. A. Varga, Chief, Light Water Reactors Eranch EA, DI"i TROM:
R. J. Sosnak, Chief, Mechanical Ingineering 3 ranch, DSS SG JEC":
INSERVICE TCS':T*G OF PL"9S A'O VALVCS Plant Name: Three Mila Island Unit 2 Licensing Stage:
Ot.
Occhat !!o. :
50-320 Responsible FM Ere-h 5 Project Ma 'neer:
L'41-4, H. Silver Responding SS Branch & Technical Reviewer: ME3, R. Z.iessel Review Statns: Avaitinz Reply In response to your request the Mechanical Engineering 3 ranch has evicwed the coments concerning Inservice resting of punps and 'ralves nade in
.4etF.i letter dated January 23, 1977.
The proposed reply is attached.
- 2. J. Bosnak, Chief Mcchnnical Engineering 3 ranch Division of Systems Safety ec wiencl:
- 1. Heineman, SS D. Yassallo, FM J. Knight, SS J. McGough, OR E. Silver, FM J. Roe, OR R. Kianael, SS cc w/o encl:-
R. Bovd, PM W. Mcdonald, MIPC Docket File 50-320 NRR Reading File DSS:ME3 File 7 9 04 27 0 09F oss; n A' 1' Doa:sIsa_L u
c Dj' or.ic -
UU 282_
t
(_
m iessel:jn sana a
n i n en*
3/dL7.7_.._
3L\\0/77.
3, L17.
3///.277..
.m NEC PORM 318 (9 76) NRCM 0240 W u. a. eovannessurr reinvine orricci e ste - ame.es4 l
4 MECHANICAL ENGINEERING BRANCH DIVISION OF SYSTEMS SAFETY THREE MILE ISLAND U' IT 2 PROPOSED RESPONSE Your letter GQL 0077 dated January 23, 1977 indicated your intention to implement the pump and valve testing requirements outlined in the draf t Technical Specifications accompanying our letter dated January 14, 1976.
The delay in the implementation of subsections IWV and IWP of Section XI of the ASME Code during the period between the issuance of an operating license and the start of co==ercial operation is acceptable.
- However, the proposal to use the draf t Technical Specification as the basis for you; interim testing program requires additional action on your part before it is acceptable to the Staff.
Since the referenc<d draft Technical Specification has been changed =any times, confusion =ay exist as to exactly what testing will be performed, and its similarity in fo*=at to that cf the final Technical Specification could lead to confusion as to the status of other =atters covered by the Technical Specification.
It is requested that relevant pu=p and valve testing information be extracted trom the referenced draft Technical Specification and be submitted for review.
80 293
-