ML19220B440
| ML19220B440 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/22/1974 |
| From: | Collins P Office of Nuclear Reactor Regulation |
| To: | METROPOLITAN EDISON CO. |
| References | |
| NUDOCS 7904260107 | |
| Download: ML19220B440 (2) | |
Text
'N U. S. ATCMIC ENERCY CC'M!SS!CN EXAM n*ATICN RI?CRT Icense applied for: RO /
/
SRO @
Aprlican:
L
-,d 4 Lccation f <E d /? 80 Pd 94
/
/
asac:cr Carrently a licensed opera:cr here? Yes /
/
No ['~ 7
'iRIM EN FXAMINA!!CN:
![/ 7
/
Cperater (See:1ca 55.21): Adninis:ared by E/d Date
/ aived /
/
SA(A)
G:ade 7br f) 1 Grrded by A*d1%, 37fh, C[3, CSrb, F 76%, G Y[%.
Catsgery Gradas:
Sanier (Seetien 55.22):
Adninistered by 6((
Date///f/! d/aived /
/
Graded by b [ d-Crada.-4 6e M %
e
/
H'54'% / !73 %, N7d, :d 9d. L79%.
Catagcry Gradas:
v Datel// 7dd'aived /
/
C?IRATING TIST: (See:1cn 55.23)
Adninistered by b
[.-
O n A, M Het /
/
Gld M E7 A'. AT!CN :
Sanier Operater - - PASSD /
/
FAILID [ N Operater - - - - - FASSC h FAILED /
/
REC M ENDATICN: M Appreve fer R M (Operater) License De not approve fot (Senicr)
(C p ;ec) License 0
0
/
)
D w
b/ - ~ J'M L
i
- 0..!": : 2 / / / L-IXAMINER
_,A
/_
ISSUE 4 !:,_^R)
(G?ERATCR) LICINSE
[
][1.h MOMW
/
Chief, Operater Licensing 3 ranch, L NOTE:
cpera:cr and cral exa=ina:icn check sheet nust be ccepleted fer each
'he a: the senior level, applican:.
If he has failed :he operating and cral tes:
the check sheet shculd be cenpleted :: indica:a his evalua:icn at the opera:cr level.
'904260 /67
~
g, pg4
~
OPEFATING AND OFE EXA.MINCION SUMARY REPORT
1.
Operating Demonstration 1.1 Pre-startup and Instrument Checks
// l Q l {3 l V///////////////////1 1.2 console operation a.
Manipulations e)'
l 5
l i
l b.
Understanding 2.
Facility Equipment k[////[/((/((((((h Sl l
I a.
Major bl l
b.
Auxiliary Ul l
l Engineered Safeguards Systems c.
///////////////////d Ins ru.en:atton 3.
3l l
l a.
Nuclear l /vi l3 I t.2 l b.
Process l$l l
l 4
Reactor Protection I///////////////M 5.
Proeedures
$l l
a.
Normal
/j'l l
/i f ~
b.
Abnormal 3l l
c.
Emergency 6.
Reactivity Effects (Except Console Operatio' '
//
!M !T 7.
Administrative Requirements l
l l
S l
l l
8.
Energency Plan l3l l
l 9.
Radiation Protection 10.
Responsibilities
]
l l
If an SRO applicant is unsatisfactory at the SRO level, complete the RO column to evaluate his adequacy at the RO level.
- For c:ic h unsatJAfactory ("U") Jist the p; ige number (s) of the operatinn-ora] cx in.ination notes on which the unsatisf actory responses are e: plained.
7G-OS5 2.
s.
..