Forwards IE Insp Rept 50-320/71-01 on 710118-19
ML19220B402
Person / Time
Site: Crane 
Issue date: 02/23/1971
From: Howard E
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19220B403 List:
References
NUDOCS 7904250693
Download: ML19220B402 (1)


Text

.

p.

um-a c-2

. m,_,

n a v....

.a... e.---......-.cy 4

iw r

.w.

{,'i v,,

D:V1 0;' C ' C C :"U"C 201 64t-r S m.,,,

.. ucs

,:..oAD :7.:::-

jw

  • N E W A T.. NEW J C;.O C Y C 710.~.

February 23, 1971 J. E. Henderson, Chief, Reactor Construction Iranch, Division of Co pliance, H(

METROPOLIT;.'s EDISC:; COMPluY, ZiREF MILE ISLI.';D 2 DOCF2T :;C. 50-320 The enclosed report of the inspection of Metropolitan Edison Co=pany's Three Mile Island Unit No. 2, conducted January 18 and 19, 1971, by D. M. Hunnicutt is forwarded for information.

The inspection was linited due to a fire on January 19, 1971, which destroyed several temporary structures.

It appears that e=phasis is being placed on Unit No. 1.

The latest e s t i-.a t e fcr co pletion of Unic "o. 2 is early 1974. Work has been te=porarily stopped on the cooling towers and other long lead items have been deferred in a conservation =ove by Metropolitan Edison.

t 1

Procure =ent documents for piping has been revised to include require =ents for hydrostatic testing by the. vendor and qualification of NDT personnel.

The stea= generator support was inspected for conformance with codes, speci-fications, and PSAR co==it=ents.

No ite=s of nonconfor=ance were identified, i

l

.o.frn.

.u' E. M. Howard Ocnior Reactor Inspector

Enclosure:

l CO Report No. 320/71-1, by D. M. Hunnicu tt, dated 2/11/71 a

t I

cc:

E. G. Case, DRS (3)

?. A. Morris, DRL R. S. Boyd, DRL (2)

R. C. DeYoung, DRL (2)

D. J. Skovholt, DRL (3)

~

P. W. Howe, DRL (2)

A. Gia=busso, CO L. Kornblith, Jr.,

R.' H. Engelken, CO

(

Regional Directors, CO r

9, FEG File Id

'A

\\

i304256693

.