Text
.
p.
um-a c-2
. m,_,
n a v....
.a... e.---......-.cy 4
iw r
.w.
{,'i v,,
D:V1 0;' C ' C C :"U"C 201 64t-r S m.,,,
.. ucs
,:..oAD :7.:::-
jw
- N E W A T.. NEW J C;.O C Y C 710.~.
February 23, 1971 J. E. Henderson, Chief, Reactor Construction Iranch, Division of Co pliance, H(
METROPOLIT;.'s EDISC:; COMPluY, ZiREF MILE ISLI.';D 2 DOCF2T :;C. 50-320 The enclosed report of the inspection of Metropolitan Edison Co=pany's Three Mile Island Unit No. 2, conducted January 18 and 19, 1971, by D. M. Hunnicutt is forwarded for information.
The inspection was linited due to a fire on January 19, 1971, which destroyed several temporary structures.
It appears that e=phasis is being placed on Unit No. 1.
The latest e s t i-.a t e fcr co pletion of Unic "o. 2 is early 1974. Work has been te=porarily stopped on the cooling towers and other long lead items have been deferred in a conservation =ove by Metropolitan Edison.
t 1
Procure =ent documents for piping has been revised to include require =ents for hydrostatic testing by the. vendor and qualification of NDT personnel.
The stea= generator support was inspected for conformance with codes, speci-fications, and PSAR co==it=ents.
No ite=s of nonconfor=ance were identified, i
l
.o.frn.
.u' E. M. Howard Ocnior Reactor Inspector
Enclosure:
l CO Report No. 320/71-1, by D. M. Hunnicu tt, dated 2/11/71 a
t I
cc:
E. G. Case, DRS (3)
?. A. Morris, DRL R. S. Boyd, DRL (2)
R. C. DeYoung, DRL (2)
D. J. Skovholt, DRL (3)
~
P. W. Howe, DRL (2)
A. Gia=busso, CO L. Kornblith, Jr.,
R.' H. Engelken, CO
(
Regional Directors, CO r
9, FEG File Id
'A
\\
i304256693
.