ML19220B319
| ML19220B319 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/11/1975 |
| From: | Skovholt D Office of Nuclear Reactor Regulation |
| To: | Moore V Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7904250632 | |
| Download: ML19220B319 (2) | |
Text
A
~
cf.a SB
.)0Cket B
7 1
J0C t t NOV 11575 3t373 re :or.
Occket File IS6EP3 Reading File
.VCCC M E U M.TA DJSkovholt, EL:ADCAC PJ'douston, EL:ISCIPS CRVan:iel, RL:ISSEP3 Docket No. 50-320
- 7. A. Moore, Assistant Director for Light ' dater Reactors. Group 2, RL RESPONSE TO STA'?DADD RI7IEW ASSICT'rIT. THPrr. MIL 2 ISLA'i3 KCLEAR STATION Ci!"S 1 A'TD 2, REVII'10F FSAR CFAPTIR 13.7 Applicant: Metrocolitmi Edison Ceepany Licensing Stage: CL Branch & Li"' Recue sting Assistance: LVD 2-2 H. Silver Review 3 ranch Invclved: Fl.:IS&E7 Requested Cocpletion Date: 10/31/75 Eeview Status: EER input complete The attached report contains draft input for the Safetv Evaluation Report relatit2 to our review of the industrial security portic,i2 of the snbject SAR.
A detailed proprietary evaluation finding is en file in this Dranch. Our memorandum of August 26, 1975 transmitted the draft input for energency ple,h g.
l....
l....
Donald J. Skovholt, Assistant Director for Cuality Assurance and Operations Division of Reactor Licensine
Enclosure:
As stated cc: ~. Kniel, Lf4'1 2-2 D. Eridges, 012-4 7h 003 RL:LS kP3 RE:IS M RL:ADGAG.
arms
- anams >
CF el 41. 9'r? cub DjSlovM t 11/
/75 lb
/75 11//// 75
..,s,
Form AAc 318 (Rev. SS3) AZCd 0240 17 v. s. oovenmusar eninvine opricas so74.aan-see 79042506SR ~
L-
?
DRAFT INPUT FOR SAFETY EVALUATION RE?CRT
-uREE MILE ISLAND NUCLEAR PLANT UNIT 2 DOCKET No.
50-320 13.7 Industrial Si urity The applicant has sub=itted a comprehensive physical recurity plan for the protection of the plant against potential acts of industrial sabotage. The plan applies to Unit 1 as well as Unit 2, and has been withheld f ro= public disclosure pursuant to 10 CFR 2. 790 (d).
We have reviewed this document, entitled, Three Mile Island Industrial Security Program, through Revision 9 dated July 15, 1975.
We find that it complies with the Co==ission's regulat_ons including 10 CFR 50.34(c) and lv CFR 73.40, is in substantial confor=ance with the positions set forth in Regulatory Guide 1.17 of June 1973, and is acceptable.
'b 004
,