ML19220B247

From kanterella
Jump to navigation Jump to search
In Response to 750429 Memo,Review of Containment Penetration Pressurization & Fluid Block Sys Are Not Planned.Will Review Sys as They Relate to Component Isolation Sys
ML19220B247
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/14/1975
From: Lainas G
Office of Nuclear Reactor Regulation
To: Kniel K
Office of Nuclear Reactor Regulation
References
NUDOCS 7904250537
Download: ML19220B247 (1)


Text

9 ugy *, 4 75 K. Kniel, Chief, Light Water Reactor Proj ect Branch 2-2, IL ti2EE liILE ISLAITD, CT1T 2 - CONTAEDC!T PETZnATION PRESSURILCivN A2ID FLUID SLOCK STSTE'.S As noted in our April 25, 1975 mer.o va do not plan to review the ecocain _

ment penetration pressurization and fluid block systers.

In respcase to your me=o of April 29, 1975, we will review the applicant's evaluntion of the consequences of cuuguent and equipacnt f ailures in the centainnent penetratica pressurization and fluid block syste=s on the contaimmt isolation function. It is therefore necessary that the applicant be advised to submit such an evaluation. Also, we vill review the desi;;ns of these systems caly insofar as they interface with the containmt isolation system; i.e., to ascertain that the coeponent and equipment designs are cc::rpatible with the ecutainment isolation provisions.

Signed by Gus Liian Cus C. T ninas, Chief cont =1-t Systems Branch Divisica of Technical Review cc:

B. Washburn J. Shapakar D. Shum B. Grimes NRR Reading File CSB Reading File Docket File /

xi.22:CSB

/!1:CSB 3,,,c,,.

y 3-3 v r.g

  • m e 5 hague r: lt

-GC:.ainas

(

,,,,,,s

, /13/75 5// i /75 m.

Term AEC.3;8 (Rev. 9 53).u Od 02e4 2 u. s. aovenmasamv P=essmee orescas sere.saa.ies 79042so557 A