ML19220B210

From kanterella
Jump to navigation Jump to search
Two Deviations from Engineers Spec Requirements Identified;Vendor Failed to Supply Required Component W/ Inverters.Equipment Can Be Upgraded
ML19220B210
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/11/1977
From: Arnold R
Metropolitan Edison Co
To: O'Reilly J
NRC Office of Inspection & Enforcement (IE Region II)
Shared Package
ML19220B202 List:
References
GQL-0475, GQL-475, NUDOCS 7904250511
Download: ML19220B210 (2)


Text

.

q

  • /

WY8 m

z /M_EJ

/

N

"" ~ ~"""

METROPOLITAN EDISON COMPANY surr:=uncr acawusucunune::cu

/

OST OFFICE SCX 542 REAOtNG,PENNSYLVANI A 196:3 TELEPHCNE 215 - 3:9-0C01

,e-.-

n.,.4,

.-- -,-:si CQL CLT5 Mr. J. ?. O'Reilly, Director U.S. Nuclear Regulatory Cc==1ssic Office of Inspection & Inforce ent Regien 1 631 ? ark Avenue 7d.ng of Prussia, ?e==sylvania 19406

Dear Sir:

~hree Mile Island Nuclear Station Cait 2 (~XI-2)

License No. C??R-66 Docke No. 50-320 Vital ?cwer Supply Inverters C March 10, 1977, Mr. Eaines of your office was verbally notified of a si:uatics which Metropolitan Edi;o Cc pany considered to be reportable in accordance with the require ents of 10CFR50.55(e).

day follow-up letter.

his letter cc stitutes the required thirty-Descric~.te:

'inile conducting tests c the vital pcuer supply inverters, two deviatices frc=

the engineer's specifica:1c require =e::s were ice::1fied.

~he inverters are the preferred power scurce for the static svi:ches with the regulated trans-for:ers as their backup.

3c h are designed to supply 120 volt pcver to the static switches. Tne specifica:ic required the pcuer to the static switches to transfer to the regula:ed transfor=ers when voltage en the inverters d: cps by 3.

FieH esting of the inverters shewed ba: the transfer did not occur in sc=e instances until the voltage dropped to 38 volts.

This was due to the vender, Solid State Centrols, Inc., not supplying a required ce=penent with the inverters, which vculd effect this transfer at the required voltage peduction.

Additic ally, anc:her specificatica require ent was that after transfer frc: the inverter to the regulated transfer =er, pcuer uns no: to transfer back to the inverter until the inverter had stabilized for 2 to 10 secceds.

Ccatrary ::

this require ent, the vendor supplied eouip=ent which prchibits transfer baci to the inverter unless the inverter stabilizes within 2 to 10 secceds of the 1:1:dal transfer.

i 74 'C21 790h5 061L,

o g

.u.r.

J. P. O'Reilly ^P r,,, -,, - i i-s

~

w_n--

sp Analvsis cf Safety I elicati m

~he deficient circuits identified affect cely the con:rol of the static switches in respcese to an inver:c: failure and do not affect the nor=al operatic: ef the vital pcwer supplies or their abili:7 to supply 1207AC pcwer to safety related 1 cads under no m i cceditions,

~he four vital pcuer supplies are indepcedent and redundant and supply independent and redundant

  • 'hile the probability of lesing a single vital power source safety syste=s.

a in respecse to a failure of a single static inverter is sc=ewhat greater vith the equipment as supplied, the loss of a single vi:al pcwer scurce will not affect the redundant scurces or prevent safe shutdew: cf the plant using redundan: safety syste=s.

For this reases there veuld be no effect c health or safety of the public or plant staff.

Corrective Actic:

~te vendor was i=ediately ec : acted regarding these discrepancies.

Dis-cussiens between the Architect Engineer and the vendor have revealed that with d---

cdificaricas, the equip =e : can be upgraded to =eet specifica ic:

requirements.

O.e engineering for these sedificacices is in progress, and all sedifica:1cas will be cc=pleted by fuel loading.

Infor=ation and docu-

=entatic: asscciated with these ecdificatices vill be available at the site for your inspectice.

7ery truly ycurs, f

N L,d o

v E. C. Ar/nold Vice Preside :

cc: Dr. Ir:s: Volgenau, Director Office of '_:spectics & Inforcence:

U.S. Nuclear Regulatory Cc issio:

~4 ashing:c:, D. C. 20ff5 f

+

f**L

., - Le..

g

./

s