Summary of 690413 Meeting W/Util,B&W & Pickard & Lowe.Notes End of Jersey Central Authority at Plant.Discusses Planned July ACRS Meeting Re Possible Exemption
ML19220B058
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/28/1969
From: Tedesco R
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7904250242
Download: ML19220B058 (1)


Text

.

Dis tribu tion :

Decket File ( -

C DRL Reacing RP3-2 Reading April 23, ICC2 Roger S. Boyd, Ass 12 tant Director for Icactor Projects, P.1 THR 2 XILZ ISLAD CTIT S0. 2 - DccxIT ro. 50-320 A brief nestin*, was held on April 23, 1969, vith representatives of the Metropolitan Edison Company, ?.abcock & Wilcar and Pickard an.1 Love. The attendees included J. iiiller, C. Charnoff, 2. Eevard.

C. '.'ard, V. Little and E. Woodard.

We were informe Tat the pronosed Ihres Mile Island Unic Ko. 2 vill r.o v c = e un d ar authority of the Metropolitan Idison Ccapany whereas previou f it was a joint venture with 'atropolitan Odison bearing raspons.bility for eseratica and Jersey Central Powr f. Li-ht havint rsspouaibility for the design. It is expected that an azend-ment vill be filad on May 7, 1967.

In addition ts the chanse of evnership, we also discussad present scheduling regarding AC2S meeting. I indicated that the present plans call for a July AC25 r.esting and principally because of the require-neat to get all the consultants' reports together and to allow ademate tina for a nanagement review prior to cc:xpiation of our reecrt.

.tr. Charnoff e-tad that this is getting rather lata hacenne they had Feen expecting a June neating.

At this time va started discussing the possibility of an exemption.

I indicated that verk ce th. report and en exemption at the same time represent a time-consuming 6 aort, but that we would do everything pessibla to satisfy his needs. It is presently expected that Metrpolitan Edison vill film a request for an aze:sption this vest s4=f1=v in nature to that requested on Unit :lo.1.

r. Charnoff f Mf rated that the erreptica weald allev them about three er four months of verk ement with the AC25 and hearing actions.

I generally cart f ami the censiderations far the hearing; nanaly, quality assuranca, site acceptability and no oWious probim** on the desi;n. In particular I stressed that the extent of the exewstion should be independent of the tendon design presently nMar review; i.e., grouted or angroeted.

Original signed by Rcbert L. Tedesco R. L. Tedesen, Chief, RPE2 cc:

F. A. Morris

1. DeTount

, er% -

n u 11 N""

cmcE >

l

$UMAME > /1IddeSCO[dl...

i.

l 4f28f69,,_

c, _ mm_,M 4 Out>

G ac-ns iaev.

1 uc.x ono u.....

.ti a

8 ^*

7904250242.