ML19220A909
| ML19220A909 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/26/1969 |
| From: | Chittenden S US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Lovejoy C US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7904250084 | |
| Download: ML19220A909 (1) | |
Text
n
}
.n a-
\\m,t r -
1
- ?
m O
C'rerics A. Lavejoy c.ccoun;ing Procedur':. 3. nch Office of tM Cent.sier JI?.3IY C.CC3.iL I%T & LIO2 COMPANY A'ID E'SOPOL12Xi 2:I2 COMPA5Y, RCE:CT! io. 6 IO LICZ333 AFFLICATICT. ICC 30 50-320 Isference is =a.ie to a ersndun frc:s Xr. 3. L. Tedesco to this office dated liarch 14, 1963, subject ac aMve, reqwsting we review the applicant's constrxtion ecst esti=ato and r.dvise you sa to its reson-shleness. The applicant's esti= ate is a.s folleva:
Total cuclear procuction piant cost (includi g all costs s.ssignable to FFC necount claasifica-tiens 321-325 inclusive plus the =ain ;x)ver transforers ordinarily included in account 353)
$164,CC', COO Costs are $ -indad for natured draft coolin6 tover0 which vill disicse of tM vaste best frc:a the nuclear plant. Ccoling tover ccastextion was r' wad to permit cT $c"e with water quality standar,'.s still in the for=ulative sts6es at both Sta*a ani Federal levels and costs a2o assigned di.ectly to Three Mile ICnM Unit 2.
These costa 1 M nd-taxes, interest during constratica, escalatien, insurance, t.wi94,3, licensing and ccating*~1es.
This plant utilizen a pre-Seized vater reactor and vill have an initial capacity of about 610 if4e, net. 15e cost per IJ of installed ca;ncity is a little less than $200, which is concidered reascnabic. The site charse-teristics are average from the stand point of construction cost ani the constex tien cost tM er is ateut average for the natics.
S. D. Chittenden, Chief Engineerirq 3rnnch Division of Constert. don cc:
. L. Tedesco, EI., w/sttacMents Tt utna
-362.
~
7904250084
_