ML19220A551

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 730723-25
ML19220A551
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/05/1973
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19220A549 List:
References
50-320-73-03, 50-320-73-3, NUDOCS 7904230062
Download: ML19220A551 (2)


Text

.

SE? 7 3 73 ENCLOSURE DESCRIPTION OF VIOLATIONS Metropolitan Edison Company Docket No. 50-320 License No. CPPR-66 Certain activities under your license appear to be in violation of AEC requirements. These apparent violations are considered to be of Category 11 severity.

1.

Criterion V, Appendix B,10 CFR 50 states in part, " Activities affecting giality shall be. prescribed by documented instructions, procedures, or drawings...and shall be accomplished in accordance with these instructions, procedures, or drawings."

Contrary to the above, and to site direc,tives:

The in-core penetration in the bottom head of the reactor a.

vessel was found to be open and unprotected.

This item was corrected prior to the conclusion of the inspection and need not be addressed in the reply.

b.

There was no documentary evidence that Makeup System Pumps HU-P-1A and 1B had been periodically rotated and Ir5ricated.

2.

Criterion VII, Appendix B,10 CFR 50 states in part " Documentary evidence that material and equipment conform to the procurement requirements shall be available at the nuclear powerplant site prior to installation...."

Contrary to the above:

Site directive QC 17-2, Revision 5, dated April 4, 1973, a.

permits " conditional installation" without defining the conditions under which it is permitted.

b.

A total of 13 Change Notices had been issued on Purchase Order 21851-LP, but the Quality Assurance Data Sheet for MU-P-1A did not establish that the pu=p met the requirements specified by the Change Notices.

7 9 0 4 2 3 00(ot l

i

,. g,3 W

s MEMO ROUTE aUP 5*

  • m e * **
  • t ma-F w c oac ="*aca-Fw amoa-Toe m A E C-9 5 ( R ev. May 84,1947) AE(.M 0240 Neve saa reevea Forswastw e-e

. or iafore a ttoa.

70 (Name saa wait)

INTIAJ atuAnas R0 Chief, Field Support & Enf B.'.,

HQ RO INSPECTION REPORT NO. 50-320/'73-03 h0:HQ (5)

RO Files oAn METROPOLITAN EDISON COMP;NY 4 Central Mail and File:,

Reculatory Standards

'3)

THREE MILE ISLAND 2 TO (Narae and eam imT1ALS REM AA ES e

, Directorate of Licens ng (13)

The attached report is being forwarded for information.

'.120. Direc tors (4)

Distribution to PDR, Local PDR, NSIC, DTIE, and state can representatives will be made af ter proprietary review a (Name.aa onio

=rins umAmas is completed by the licensee.

cm l

FROM (Name and unit)

RIM Aa ns

"-. Morris floward

" ** w u jn)

Piomi NCL Daft 278 9/7/73 USE OTHEA $4M FOR ADDITKmAL REMAAKS CPO : Ista O.445 4as b

o

=

9

[,

g.yg kT : ??J h~

i.

-