ML19214A054

From kanterella
Jump to navigation Jump to search
Task Order No. 31310019F0075 Under Delivery Order No. NRC-HQ-25-14-E-0004
ML19214A054
Person / Time
Issue date: 07/23/2019
From: Jeffrey Mitchell
Acquisition Management Division
To: Edelstein P
Numark Associates
References
NRC-HQ-25-14-E-0004
Download: ML19214A054 (19)


Text

ORDER FOR SUPPLIES OR SERVICES

3. ORDER NO.
4. REQUISITION/REFERENCE NO.

PAGE OF PAGES

5. ISSUING OFFICE (Address correspondence to)
b. STREET ADDRESS IMPORTANT: Mark all packages and papers with contract and/or order numbers.

1

1. DATE OF ORDER
2. CONTRACT NO. (If any)
6. SHIP TO:
a. NAME OF CONSIGNEE
c. CITY
d. STATE
e. ZIP CODE
7. TO:
a. NAME OF CONTRACTOR
f. SH P VIA
8. TYPE OF ORDER
b. COMPANY NAME
c. STREET ADDRESS
d. CITY
e. STATE
f. Z P CODE
9. ACCOUNTING AND APPROPRIATION DATA
a. PURCHASE
b. DELIVERY REFERENCE YOUR:

Please furnish the following on the terms and conditions specified on both sides of this order and on the attached sheet, if any, including delivery as indicated.

Except for billing instructions on the reverse, this delivery order is subject to instructions contained on this side only of this form and is issued subject to the terms and conditions of the above-numbered contract.

10. REQUISITION NG OFFICE
11. BUS NESS CLASS FICATION (Check appropriate box(es))
a. SMALL
b. OTHER THAN SMALL
c. DISADVANTAGED
d. WOMEN-OWNED
13. PLACE OF
a. INSPECTION
b. ACCEPTANCE
14. GOVERNMENT B/L NO.
15. DELIVER TO F.O B. POINT ON OR BEFORE (Date)
16. DISCOUNT TERMS
17. SCHEDULE (See reverse for Rejections) 08/02/2019 31310019F0075 RES-19-0138 US NRC ASSISTANCE AGREEMENTS ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-8E06M WASHINGTON DC 20555-0001 PAUL EDELSTEIN NUMARK ASSOCIATES INC 1220 19TH ST NW STE 500 WASHINGTON DC 200362444 See Schedule
12. F.O B. POINT NUCLEAR REGULATORY COMMISSION NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555-0001 OFFICE OF NEW REACTORS ITEM NO.

(a)

SUPPLIES OR SERVICES (b)

QUANTITY ORDERED (c)

UNIT (d)

UNIT PRICE (e)

AMOUNT (f)

QUANTITY ACCEPTED (g)

X X

19 Destination Destination NRC-HQ-25-14-E-0004 30

f. SERVICE-DISABLED VETERAN-OWNED
e. HUBZone
g. WOMEN-OWNED SMALL BUS NESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

h. EDWOSB The NRC hereby awards task order NRC-HQ-25-14-E-0004 / 31310019F0075 entitled Support for XFEM Component Integrity Analysis Total Obligated Amount: $

Continued...

19. GROSS SHIPPING WEIGHT
18. SHIPPING POINT
20. INVOICE NO.
21. MAIL INVOICE TO:
a. NAME
b. STREET ADDRESS (or P.O. Box)
c. CITY
d. STATE
e. Z P CODE SEE BILLING INSTRUCTIONS ON REVERSE 17(h)

TOTAL (Cont.

pages) 17(i)

GRAND TOTAL

$296,961.12

22. UNITED STATES OF AMERICA BY (Signature)
23. NAME (Typed)

TITLE: CONTRACTING/ORDER NG OFFICER JEFFREY R. MITCHELL

$200,652.28 OPTIONAL FORM 347 (Rev. 2/2012)

Prescribed by GSA/FAR 48 CFR 53.213(f)

AUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION NOT USABLE 07/23/2019 US NUCLEAR REGULATORY COMMISSION ONE WHITE FLINT NORTH 11555 ROCKVILLE PIKE MAILSTOP O3-E17A ROCKVILLE MD 20852-2738

DATE OF ORDER 2

ORDER FOR SUPPLIES OR SERVICES SCHEDULE - CONTINUATION CONTRACT NO.

AMOUNT UNIT PRICE UNIT QUANTITY ORDERED SUPPLIES/SERVICES ITEM NO.

MPORTANT: Mark all packages and papers with contract and/or order numbers.

ORDER NO.

QUANTITY ACCEPTED 08/02/2019 31310019F0075 PAGE NO (a)

(b)

(c)

(d)

(e)

(f)

(g)

NRC-HQ-25-14-E-0004 Total Estimated Cost: $

Acceptance of 31310019F0075 should be made by having an official, authorized to bind your organization.

Numark Authorized Official Date Accounting Info:

2019-X0200-FEEBASED-60-60D001-60B101-1032-11 154-252A-11-6-154-1032 Period of Performance: 07/15/2019 to 10/31/2020 00001 Cost Reimbursement Task 1-4 Line Item Ceiling: $

Incrementally Funded Amount: $

00002 Fixed Fee Task 1-4 Line Item Ceiling: $

Incrementally Funded Amount: $

10001 Cost Reimbursement (Optional Task 5) 0.00 Amount: $

(Option Line Item)

Anticipated Exercise Date10/31/2020 10002 Fixed Fee (Optional Task 5) 0.00 Amount: $

(Option Line Item)

Anticipated Exercise Date10/31/2020 The obligated amount of award: $

The total for this award is shown in box 17(i).

Prescribed by GSA FAR (48 CFR) 53.213(f)

OPTIONAL FORM 348 (Rev. 4/2006)

AUTHORIZED FOR LOCAL REPODUCTION PREVIOUS EDITION NOT USABLE TOTAL CARR ED FORWARD TO 1ST PAGE (ITEM 17(H))

$200,652.28

Page 2 Contracting Officer shall increase the amount obligated with respect to this order, in accordance with FAR Part 43 - Modifications. Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk and may not be reimbursed by the Government.

(d) The Contractor shall comply with the provisions of FAR 52.232 Limitation of Funds, for incrementally-funded delivery orders or task orders.

(End of clause)

B.3 PRICE/COST SCHEDULE CLIN BASIC 0001 0001a Direct Labor including G&A 0001b Subcontractor Labor Including Sub Handling 0001c ODCs including G&A 0001d Subcontractor Travel including Sub Handing Total Estimated Costs 0002 Fixed Fee Total CLIN OPTION 1001 1001a Direct Labor including G&A 1001b Subcontractor Labor Including Sub Handling Total Estimated Costs 1002 Fixed Fee Total

Page 3 SECTION C - Description/Specifications C.1 STATEMENT OF WORK (SOW) 1.

PROJECT TITLE Support for XFEM component integrity analysis 2.

BACKGROUND Operating experience has shown that dissimilar metal welds using Alloys 82 and182 exposed to primary coolant water (or steam) under the normal operating conditions of pressurized water reactors (PWRs) are susceptible to primary water stress corrosion cracking (PWSCC). This cracking typically initiates at the inside surface of these component welds when exposed to reactor coolant and in the presence of high tensile residual stresses introduced by welding (or weld residual stresses), and can progress through the thickness of the component leading to leakage and even rupture. In response to this potential degradation of the reactor pressure vessel boundary the NRC requires augmented inspections of susceptible components in order to identify PWSCC flaws before they compromise component integrity and allow for repair and replacement. When flaws are identified, licensees must then complete a flaw analysis to verify that the flaw will not grow to failure before the next inspection; otherwise, they must repair or replace the component. If the licensee analysis determines that it is safe to continue operating with the flaw in place, the analysis is then reported to the NRC for approval. When regulatory staff review these flaw analyses, independent confirmatory analyses are often required.

Traditionally this flaw analysis is done by first determining the weld residual stresses (WRS), and then analyzing how the crack would grow through that stress field.

Current practice involves determining the WRS profile of the component using finite element models, and applying it to standard ASME Code empirically based PWSCC growth models to determine the crack growth rate. Currently, NRC is capable of performing this type of analysis accurately and efficiently in order to assist regulatory staff in a timely manner. However, while useful for estimating crack growth in simple components and geometries that can be approximated using two-dimensional models, this generic approach requires excess conservatism in order to ensure broad applicability, and these simple representations begin to lose their meaning when applied to more complicated three-dimensional components with more complex stress states.

As computational power increases and finite element modeling techniques improve, licensees seek to improve their analyses to eliminate unnecessary conservativisms and analyze more complex components where the standard empirical models are not applicable. In order to do so, traditional flaw growth analyses are being replaced by finite element models to predict crack growth rate.

Historically, simulating cracks and crack growth using conventional finite element analysis (FEA) has proven difficult and time consuming especially for modeling realistic multi-directional crack growth. More recently, methods that allow for realistic crack growth to be modeled using straight forward techniques have been developed.

Specifically, the extended finite element method (xFEM) is a FEA tool that allows for

Page 4 mesh-independent analysis of discontinuities and singularities, and can be used to simulate crack growth in complex geometries in a simplified manner [1]. This capability is currently available to NRC through the use of ABAQUS. ABAQUS implementation of xFEM is potentially a powerful tool for representing cracks and simulating crack growth in industry relevant models. With the right choice of elements and meshing parameters, xFEM has proven capable of simulating critical and fatigue crack growth rates in complex systems, with results that closely match classic numerical and experimental results [2]. In some cases, xFEM results have shown to be extremely reliable, and have been used in developing industry standards regarding flaw proximity analysis [3], [4], [5]. Authors have also investigated the ABAQUS implementation of xFEM to calculate stress intensity factors for pre-existing cracks, and found good agreement with stress intensity factors generated with traditional FEA meshes [6]. While the use of crack-conforming meshes and procedural re-meshing allow for crack growth simulations with traditional finite element analysis, it is the ability of xFEM to accomplish such simulations without these cumbersome procedures that make xFEM particularly useful.

NRC currently has developed the capability to perform XFEM based PWSCC crack growth analysis in ABAQUS. Technical assistance in examining the capabilities, limitations and applicability of XFEM is required to develop a sound technical basis for performing these analyses. Additionally, NRC is interested in what other tools can be used for this type of analysis and how they compare in terms of performance and results. Technical basis development involves performing the following activities and reporting the results:

Performing sensitivity analyses to identify important factors in model parameters that can ensure accurate and repeatable XFEM results.

Thoroughly investigate the the applicability of XFEM in complex geometries relevant to commercial nuclear power components Perform study to identify and develop benchmark problems to verify ABAQUS XFEM PWSCC crack growth results.

Identify and investigate alternative, current and modern FEA tools capable of similar XFEM analysis (e.g. ANSYS, MORFEO, GRIZZLY, etc)

List of

References:

[1] Sukumar, Natarajan, et al., "Modeling holes and inclusions by level sets in the extended finite-element method," Computer methods in applied mechanics and engineering, pp. 6183-6200, 2001.

[2] Shim, Do-Jun, et al., "Application of extended finite element method (XFEM) to stress intensity factor calculations," in Proceedings of the ASME 2015 Pressure Vessels and Piping Conference, 2015.

[3] Lacroix, Valéry, et al., "Alternative Characterization Rules For Quasi-Laminar Flaws Based On 3d X-Fem Calculations," in Proceedings of the ASME 2015 Pressure Vessels & Piping Conference, 2015.

[4] Lacroix, Valéry, et al., "Alternative Characterization Rules For Quasi-Laminar Flaws," in Proceedings of the ASME 2014 Pressure Vessels & Piping Conference, 2014.

[5] Lacroix, Valéry, et al., "Combination Criterion for Multiple Laminar Flaws in Steel

Page 5 Components," Key Engineering Materials, pp. Vol. 741, pp 63-69, 2017.

[6] Singh, I. V., et al., "The numerical simulation of fatigue crack growth using extended finite element method," International Journal of Fatigue, pp. Vol. 36, Issue 1, 109-119, 2012.

3.

PROJECT DESCRIPTION AND OBJECTIVE(S)

The objective of this task order is to obtain expert technical assistance services from the contractor to apply in performing analyses using ABAQUS XFEM in complex primary system reactor coolant pressure boundary (RCPB) components and associated primary water stress corrosion cracking (PWSCC) flaw analyses.

This requirement falls under EWC IDIQ SOW Paragraph 3.2 - Licensing Support.

4.

STATEMENT OF WORK TASKS Task 1: Perform Literature Review Within 30 days of award, the contractor shall perform an assessment of the applicability and limitations of XFEM for modeling subcritical crack growth (e.g.

fatigue cracking, stress corrosion cracking, etc.) based on publicly available information. Specifically, the contractor shall conduct a literature review in search for cases where XFEM was used for engineering applications pertaining to subcritical crack growth in metallic piping and vessels. The contractor shall document the XFEM applications found, document any specific techniques used to model subcritical crack growth with XFEM, and document any limitations reported in the open literature.

Deliverables for Task 1 The contractor shall prepare and submit a draft Technical Letter Report (TLR) covering all work performed under this task within 60 days after award. The Draft TLR prepared by the contractor shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

The contractor shall prepare a Final TLR incorporating any comments on the Draft TLR from the COR. The Final TLR shall be provided no later than 30 days after the COR provides comments to the contractor.

The contractor shall provide to the NRC all the input files and their supporting files created for this task.

Task 2: Conduct Sensitivity Studies The contractor shall perform analyses using the ABAQUS XFEM to determine those parameters that control the accuracy and repeatability of analysis results.

Specifically, using 2-D and simple 3-D models the contractor shall conduct the activities listed below.

An analysis of the sensitivity of results to mesh parameters. These parameters include overall geometry, size, and orientation. This sensitivity should then be

Page 6 compared to results using traditional finite element crack results or other acceptable analytical solutions An analysis of the sensitivity of results to crack geometry, and how this relates to the mesh parameters.

An analysis of how the crack parameter results compare between static and dynamic crack analyses.

Deliverables for Task 2 The contractor shall prepare and submit a draft Technical Letter Report (TLR) covering all work performed under this task within 60 days of completion of the task.

The Draft TLR prepared by the contractor shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

The contractor shall prepare a Final TLR incorporating any comments on the Draft TLR from the COR. The Final TLR shall be provided no later than 45 days after the COR provides comments to the contractor.

The contractor shall provide to the NRC all the input files and their supporting files created for this task.

Task 3: Investigate Complex Geometries The contractor shall perform analyses using the ABAQUS XFEM to determine the applicability of these analyses in complex geometries relevant to the NRC.

Specifically, the contractor shall evaluate how ABAQUS XFEM crack parameter results compare to traditional analysis for components including pressure vessel nozzles, branch connections, and J-Groove welds.

Deliverable for Task 3 The contractor shall prepare and submit a draft Technical Letter Report (TLR) covering all work performed under this task within 60 days of completion of the task.

The Draft TLR prepared by the contractor shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

The contractor shall prepare a Final TLR incorporating any comments on the Draft TLR from the COR. The Final TLR shall be provided no later than 45 days after the COR provides comments to the contractor.

The contractor shall provide to the NRC all the input files and their supporting files created for this task.

Task 4: Develop Benchmarks The contractor shall perform a study to develop models that can be used to benchmark XFEM for use in PWSCC crack growth analyses. Specifically, the contractor shall conduct the activities listed below.

Perform literature search for PWSCC crack growth in test sample geometries that can be modeled in ABAQUS to verify results

Page 7 Study operating experience of PWSCC to identify potential components geometries that can be modeled, such that analysis results may be compared to observed real world behaviors.

Develop problem definitions identifying component and crack geometry, operating parameters, and loads which can be used to independently develop models to verify XFEM results.

Deliverable for Task 4 The contractor shall prepare and submit a draft Technical Letter Report (TLR) covering all work performed under this task within 60 days of completion of the task.

The Draft TLR prepared by the contractor shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

The contractor shall prepare a Final TLR incorporating any comments on the Draft TLR from the COR. The Final TLR shall be provided no later than 45 days after the COR provides comments to the contractor.

The contractor shall provide to the NRC all the input files and their supporting files created for this task.

Option Task 5: Investigate Alternative Tools This is an optional task, the need for which will be identified by the COR depending on the results of the previous tasks. In this task, the contractor shall investigate the performance of at least one other current and modern FEA tool capable of similar XFEM analysis (e.g. ANSYS, MORFEO, GRIZZLY, etc). The additional FEA tool(s) investigated for this task shall be agreed upon by both the contractor and COR. The tool should be capable of similar analyses to those that can be performed with ABAQUS. Specifically, the contractor shall conduct the activities listed below.

Develop and perform a study to identify any difference in the performance and results between ABAQUS and the additional FEA tool(s) being investigated. This examination should include similar sensitivity and geometry studies as described in Tasks 2 and 3.

Perform a benchmarking study using model definitions developed for Task 4, and perform analysis using ABAQUS and the additional FEA tool(s) being investigated in order to compare results.

Deliverable for Task 5 The contractor shall prepare and submit a draft Technical Letter Report (TLR) covering all work performed under this task within 60 days of completion of the task.

The Draft TLR prepared by the contractor shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

The contractor shall prepare a Final TLR incorporating any comments on the Draft TLR from the COR. The Final TLR shall be provided no later than 45 days after the COR provides comments to the contractor.

The contractor shall provide to the NRC all the input files and their supporting files created for this task.

Page 8 5.

APPLICABLE DOCUMENTS AND STANDARDS ASME Boiler & Pressure Vessel Code,Section XI and Section III.

6.

DELIVERABLES AND DELIVERY SCHEDULE/REPORTING REQUIREMENTS The contractor shall provide the deliverables stated in the table below in electronic format unless otherwise directed by the COR. The electronic format shall be provided using a Microsoft-based product, (e.g., Outlook, Word, Excel, PowerPoint) unless the COR and the contractor specifically agree on another format. All deliverables, with the exception of the Monthly Letter Status Report (MLSR) shall be in the format of draft version, revision version with redline/strikeout, and a revised version which shall become the final version. The contractor shall explicitly state in its submittal(s) that the product provided is the deliverable for Task XX, as further described below.

The Contractor shall submit the following deliverables to the task order COR. Unless otherwise directed by the COR or the Contracting Officer (CO), the contractor must provide all deliverables except the MLSR as draft products. The COR will review all draft deliverables (and coordinate any internal NRC staff review, if needed) and provide comments back to the contractor. The contractor shall revise the draft deliverable based on the comments provided by the COR and then deliver a revised version of the deliverable, which will then be considered the Final Version. When mutually-agreed upon between the contractor and the COR, the contractor may submit preliminary or partial drafts to help gauge the contractors understanding of the particular work requirement. More than one round of drafts may be needed if the contractor does not successfully incorporate the CORs comments on the previous draft.

The contractor shall develop, maintain, and control data, files, information, and deliverables pursuant to this task order.

Deliverable Schedule Task No.

Description Completion Date 1

Draft TLR covering all work performed for Task-1. The Draft TLR shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

Draft TLR is due in 60 days from the task order award.

1 Final TLR incorporating any comments from the COR.

30 days after the COR comments are received. If applicable, additional revisions are due 15 days after COR request for a revision.

2 Draft TLR covering all work performed for Task-2. The Draft TLR shall summarize Task-2 duration is 4 months from the task order award.

Page 9 the efforts completed, propose conclusions, and identify recommendations for any issues identified.

Draft TLR is due in 60 days from the task completion date.

2 Final TLR incorporating any comments from the COR.

45 days after the COR comments are received. If applicable, revisions are due 30 days after COR request for a revision.

3 Draft TLR covering all work performed for Task-3. The Draft TLR shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

Task-3 duration is 7 months from the task order award.

Draft TLR is due in 60 days from the task completion date.

3 Final TLR incorporating any comments from the COR.

45 days after the COR comments are received. If applicable, revisions are due 30 days after COR request for a revision.

4 Draft TLR covering all work performed for Task-4. The Draft TLR shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

Task-4 duration is 10 months from the task order award.

Draft TLR is due in 60 days from the task completion date.

4 Final TLR incorporating any comments from the COR.

45 days after the COR comments are received. If applicable, revisions are due 30 days after COR request for a revision.

5 (opt)

Draft TLR covering all work performed for Task-5. The Draft TLR shall summarize the efforts completed, propose conclusions, and identify recommendations for any issues identified.

Task-5 duration is 12 months from the task order award.

Draft TLR is due in 60 days from the task completion date.

5 (opt)

Final TLR incorporating any comments from the COR.

45 days after the COR comments are received. If applicable, revisions are due 30 days after COR request for a revision.

All MLSR per Section F.3 and Attachment 5 of the IDIQ contract. Detail the work effort by labor category.

20th. calendar day of the following month Acceptance Criteria for Deliverables: The above deliverables shall be submitted to the task order COR. Unless otherwise directed by the COR or the CO, the contractor must provide all deliverables except the Monthly Letter Status Reports (MLSR) as draft products. The COR will review all draft deliverables (and coordinate any internal NRC staff review, if needed) and provide comments back to the contractor. The contractor shall revise the draft deliverable based on the comments provided by the COR and then deliver a revised version of the deliverable, which will then be considered the Final Version. When mutually-agreed upon between the contractor and the COR, the contractor may submit preliminary or partial drafts to help gauge the contractors understanding of the particular work requirement. More than one round of drafts may be needed if the contractor does not successfully incorporate the CORs comments on the previous draft.

Page 10 The contractor shall submit the raw and processed data and worksheet and/or input files used in analyses with the Draft TLRs, upon request by the COR and with the Final TLRs, in a tabulated Excel format or other format as directed by the COR.

Note: This delivery schedule may be modified after task order award via Technical Direction from the COR, provided Contractor has agreed to the changes incorporated in the Technical Direction letter.

Technical Directions The COR may issue Technical Directions (TDs) from time to time throughout the duration of the task order. These TDs must be within scope of the task order SOW and shall not constitute new assignments of work or changes of such a nature as to constitute a change to the task order cost or period of performance. Any modifications to the scope of work, cost, or period of performance of this task order must be issued by the task order Contracting Officer (CO) and shall be coordinated with the task order Contracting Officers Representative (COR). The COR may issue TDs for the purpose of making adjustments or clarifications to the timing and performance of the tasks/sub-tasks (if applicable) and/or the milestone schedule/delivery schedule of the documents within this task order.

In the event that the contractor believes that a TD issued against this task order has an impact in terms of changing the scope, cost, or period of performance of the task order, the contractor shall immediately inform the task order CO and request appropriate guidance prior to taking action on the TD in question.

7.

GOVERNMENT-FURNISHED PROPERTY None 8.

PLACE OF PERFORMANCE The work to be performed under this task order shall be performed at the Contractors facility except for the travel described in Section 11 of this statement of work.

9.

SPECIAL CONSIDERATIONS TRAVEL/MEETINGS The following travel may occur under this task order -

Travel Description Task(s)

Location Date Days Attendees FY 2019 Kick-off meeting at NRC All Rockville, MD TBD 2

1 FY 2020

Page 11 Travel Description Task(s)

Location Date Days Attendees Program Review at NRC All Rockville, MD TBD 2

1 Travel Notes --

a.

All contractor travel requires prior written approval from the COR.

b.

Number of trips, number of contractor personnel, duration, location, may be modified based on meeting circumstances and COR's need for contractor support. Contractor shall implement travel cost-sharing measures (for example sharing rental car) if possible.

c.

At the discretion of the COR, meetings may be conducted via telephone, video conference, or at the contractor site.

d.

Contractor will be authorized travel expenses consistent with the substantive provisions of the Federal Travel Regulation (FTR) and the limitation of funds specified in this contract/order. All travel requires written Government approval from the CO, unless otherwise delegated to the COR.

e.

Travel will be reimbursed in accordance with FAR 31.205-46, Travel costs and the General Services Administrations Federal Travel Regulations at:

http://www.gsa.gov/portal/content/104790. At a minimum, for each known trip/meeting, include the following:

f.

All travel requires prior written approval from the COR.

SECURITY The work will be UNCLASSIFIED.

Work on this task order may involve the handling of documents that contain proprietary information. The contractor shall safeguard documents containing proprietary information against unauthorized disclosure. After completion of work, the contractor shall either destroy the documents or return them to the NRC. If they are destroyed, please confirm this in an e-mail to the COR with a copy to the CO and include the date and manner in which the documents were destroyed.

KEY EQUIPEMENT, CERTIFICATIONS, and ANALYSIS TOOLS The following analysis tools shall be required to perform the research described in this statement of work:

Analysis Capabilities/Tools:

Finite element analysis capabilities with specialized user-defined subroutines and XFEM using ABAQUS to model and analyze PWSCC crack growth work under this task order. Finite element analysis capabilities to perform equivalent XFEM analyses with at least one other modern and current FEA tool besides ABAQUS (e.g. ANSYS, Morfeo, GRIZZLY, etc.).

LICENSE FEE RECOVERY All work under this task order is not license fee recoverable.

DATA RIGHTS

Page 12 The NRC shall have unlimited rights to and ownership of all deliverables provided under this contract/order, including reports, recommendations, briefings, work plans and all other deliverables. All documents and materials, to include the source codes of any software, produced under this contract/order are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written authorization from the CO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. The definition of unlimited rights is contained in Federal Acquisition Regulation (FAR) 27.401, Definitions. FAR clause at FAR 52.227-14, Rights in Data-General, is hereby incorporated by reference and made a part of this contract/order

Page 13 SECTION F - Deliveries or Performance F.1 PERIOD OF PERFORMANCE This contract shall commence on July 15, 2019 and will expire on October 31, 2020.

(End of Clause)

Page 14 SECTION H - Special Contract Requirements H.1 KEY PERSONNEL. (JAN 1993) 2052.215-70 Key personnel. (JAN 1993)

As prescribed at 2015.209-70(a)(1), the contracting officer shall insert in solicitations and contracts the following clause as applicable to the requirement:

KEY PERSONNEL (JAN 1993)

(a) The following individuals are considered to be essential to the successful performance of the work hereunder:

NAME Labor Category/Position Subject Matter Expert / Principal Investigator Senior Technical Review The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section.

(b) If one or more of the key personnel, for whatever reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the contracting officer and shall, subject to the concurrence of the contracting officer, promptly replace the personnel with personnel of at least substantially equal ability and qualifications.

(c) Each request for approval of substitutions must be in writing and contain a detailed explanation of the circumstances necessitating the proposed substitutions. The request must also contain a complete resume for the proposed substitute and other information requested or needed by the contracting officer to evaluate the proposed substitution.

The contracting officer and the project officer shall evaluate the contractor's request and the contracting officer shall promptly notify the contractor of his or her decision in writing.

(d) If the contracting officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the contract or the service order, the contract may be terminated by the contracting officer for default or for the convenience of the Government, as appropriate.

If the contracting officer finds the contractor at fault for the condition, the contract price or fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.

(End of Clause)

H.2 CONTRACTING OFFICERS REPRESENTATIVE (a) The contracting officer's authorized representative hereinafter referred to as the

Page 16 duly issued by the project officer in the manner prescribed by this clause and within the CORs authority under the provisions of this clause.

(f) If, in the opinion of the contractor, any instruction or direction issued by the COR is within one of the categories defined in paragraph (c) of this section, the contractor may not proceed but shall notify the contracting officer in writing within five (5) working days after the receipt of any instruction or direction and shall request that contracting officer to modify the contract accordingly. Upon receiving the notification from the contractor, the contracting officer shall issue an appropriate contract modification or advise the contractor in writing that, in the contracting officer's opinion, the technical direction is within the scope of this article and does not constitute a change under the "Changes" clause.

(g) Any unauthorized commitment or direction issued by the COR may result in an unnecessary delay in the contractor's performance and may even result in the contractor expending funds for unallowable costs under the contract.

(h) A failure of the parties to agree upon the nature of the instruction or direction or upon the contract action to be taken with respect to the instruction or direction is subject to 52.233 Disputes.

(i) In addition to providing technical direction as defined in paragraph (b) of the section, the project officer shall:

(1) Monitor the contractor's technical progress, including surveillance and assessment of performance, and recommend to the contracting officer changes in requirements.

(2) Assist the contractor in the resolution of technical problems encountered during performance.

(3) Review all costs requested for reimbursement by the contractor and submit to the contracting officer recommendations for approval, disapproval, or suspension of payment for supplies and services required under this contract.

(End of Clause)

Page 17 SECTION J - List of Documents, Exhibits and Other Attachments J.1 List of Documents, Exhibits, and Other Attachments Attachments:

1.

Monthly Letter Status Report Template (Furnished Upon Request) 2.

Cost Reimbursement Billing Instructions (Furnished Upon Request)