Letter Sequence Request |
---|
EPID:L-2019-LLA-0236, Emergency Core Cooling System Model Change Pursuant to the Requirements of 10 CFR 50.46 Submittal Schedule Commitment Change (Approved, Closed) EPID:L-2019-LLA-0243, Emergency Core Cooling System Model Change Pursuant to the Requirements of 10 CFR 50.46 Submittal Schedule Commitment Change (Approved, Closed) |
|
MONTHYEARML19214A0472019-07-30030 July 2019 Emergency Core Cooling System Model Change Pursuant to the Requirements of 10 CFR 50.46 Submittal Schedule Commitment Change Project stage: Request ML19309D1972019-10-30030 October 2019 Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident Project stage: Request ML19309D1962019-10-30030 October 2019 Proposed License Amendment Request Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) Project stage: Request ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 Project stage: Other ML20272A2272020-10-23023 October 2020 Audit Summary: Proposed License Amendment Request for the Addition of Westinghouse Topical Report Project stage: Other ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report Project stage: Approval ML20302A1792020-10-29029 October 2020 Non-Proprietary, Issuance of Amendment Nos. 286 and 269 to Revise Technical Specifications to Allow Usage of a Full Spectrum Loss of Coolant Accident Methodology Project stage: Approval 2020-10-23
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 30, 2019 10 CFR 50.46 U.S. Nuclear Regulatory Commission Serial No.: 19-305 Attention: Document Control Desk NRA/GDM: RO Washington, DC 20555 Docket Nos.: 50-280/281 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 EMERGENCY CORE COOLING SYSTEM (ECCS) MODEL CHANGE PURSUANT TO THE REQUIREMENTS OF 10 CFR 50.46 SUBMITTAL SCHEDULE COMMITMENT CHANGE
References:
- 1. Letter from J. Alan Price (Dominion Energy Virginia) to USNRC, "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, 30-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46, Serial No.12-420, July 10, 2012. [ADAMS Accession No. ML12199A061]
- 2. Letter from Mark D. Sartain (Dominion Energy Virginia) to USNRC, "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, Emergency Core Cooling System (ECCS) Model Change Pursuant to the Requirements of 10 CFR 50.46, Submittal Schedule Commitment Change," Serial No.17-158, April 28, 2017. [ADAMS Accession No. ML17125A256]
By letter dated July 10, 2012 (Reference 1), Virginia Electric and Power Company (Dominion Energy Virginia) submitted a letter to the NRC with information related to an evaluation of fuel pellet thermal conductivity degradation (TCD) with fuel burnup in the Westinghouse Best Estimate Large Break Loss of Coolant Accident (LBLOCA) analysis methodology for Surry Power Station (SPS) Units 1 and 2 and its effect on peak cladding temperature (PCT). This letter contained a commitment to submit to the NRC for review and approval a LBLOCA analysis that applies NRG-approved methods that include the effects of fuel pellet TCD. A commitment due date of June 15, 2017 was indicated. By letter dated April 28, 2017 (Reference 2), Dominion Energy Virginia changed the commitment date for submittal of the LBLOCA analysis for Surry Units 1 and 2 from June 15, 2017 to August 30, 2019 due to delays in obtaining NRC approved methodologies that included the effects of fuel pellet TCD. These methodologies that explicitly account for TCD were subsequently approved by the NRC.
The LBLOCA analysis commitment for SPS Units 1 and 2 will utilize the Westinghouse FULL SPECTRUM' LOCA (FSLOCA') Evaluation Model with fuel rod inputs that explicitly account for fuel pellet TCD based on the Westinghouse PAD5 fuel
. .,. -~
Serial No.19-305 Docket Nos. 50-280/281 Page 2 of 3 performance code. However, an error associated with the Westinghouse FSLOCA' EM application has delayed completion of the engineering and licensing documentation to support submittal of the SPS FSLOCA' analysis by August 30, 2019. As a result, this letter revises the commitment date for submittal of the LBLOCA analysis for SPS Units 1 and 2 from August 30, 2019 to October 31, 2019.
If you have any questions or require additional information regarding this submittal, please contact Mr. Gary D. Miller at (804) 273-2771.
Respectfully, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitment made in this letter:
By October 31, 2019, Dominion Energy Virginia will submit to the NRC for review and approval a LBLOCA analysis that applies an NRC-approved ECCS Evaluation Model that includes the effects of fuel pellet thermal conductivity degradation.
Serial No.19-305 Docket Nos. 50-280/281 Page 3 of 3 cc: U. S. Nuclear Regulatory Commission, Region II Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Ms. Karen R. Cotton Gross NRC Project Manager Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Mr. G. Edward Miller NRC Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station