ML19212A249

From kanterella
Jump to navigation Jump to search
QA Program Approval for Radioactive Matl package:0124, Revision 0
ML19212A249
Person / Time
Site: 07100124
Issue date: 07/19/1979
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML19208A227 List:
References
NUDOCS 7909130252
Download: ML19212A249 (1)


Text

-......

NRC l'OMM 311 U.S. NUCL EArt lu GULATORY COMMISSION

1. A PP H OV A L N U YB E R OUALITY ASSURANCE PROGRAM APPROVAL 0124 "2-""

novisio N Nu vola FOR RADIOACTIVE MATERIAL PACKAGES O

Pursuant to the Atomic Energy Act of 1954,as amended,the Energy Reorganization Act of 1974, as amenAd, and Title 10, Code of Federal Re 1alations, Chapter 1, Part 71, and in reliance on statements and representations beretofore made in Item 5 tr/ the person named in Item 2,the Quality Assurance Prosram identified in item 5 is hereby approved. This approvalis issued to satisfy the requirements of Section 71.51 of 10 CFR Part 71. This anproval is subject to all applicable refes, regulations, and onfus of the Nuclur firjulatory Comminion now or heicaf ter in effect and to any conditions specified below.

2. N A M L
3. E X PiH AT IO N D AT L Ho_uston Inspection Laboratories, Inc.

T HL L T ADDHLss October 30, 1984 12300 Zavalla 4 oock'T NuMoes CilY STATL ZIP COOL

_lfouston TX 77085 71-0124

6. QUALIT Y ALSUR ANCE PROCHAM AFPLICATION DAT LtS)

June _21 1978

6. CONDIT loNS A.

Activities conducted under applicable criteria of Appendix E of 10 CFR Part 71 to be executed with regard to transportation packages by October 1,1979.

B.

The shipping activities authori' zed by this approval are procurement, mainten-ance, repair, and use.

All other shipping activities (i.e., design, fabrica*.icn, assembly, testing, and modification) shall be satisficd by obtaining certifi-cations from package suppliers that these activities were conducted in accordance with an IRC-cpproved Q1 program.

It shall remain the responsibility of th^

k licensee-user that all transportation activities meet the requirements of 10 CFR {71.51.

C.

Everything after page 4 is not included as part of your Qi program,

n. f

=.. t. O-6 w.

3I Uk

,[mg;,[_ M___ [cq L: fiU.0Lfjn IEGuLATORY COYMISSION sioNATunc y

oarc Charles E. MacDonald, hief, TranspocLition Dranch, Division of Fuel Cycle and Material Safety. miss JUL 1919,70 o

,q 'r 7909130 A

-