ML19211D382
| ML19211D382 | |
| Person / Time | |
|---|---|
| Issue date: | 12/28/1979 |
| From: | Glagola A NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | |
| Shared Package | |
| ML19211D383 | List: |
| References | |
| CON-FIN-B-1168, CON-NRC-03-78-150, CON-NRC-3-78-150 NUDOCS 8001180363 | |
| Download: ML19211D382 (1) | |
Text
a I
CONTRACT NUMBER NRC FORM 255 (10 76)
NRC-03-78-150 Task IV DIVISION OF CONTR ACTS MODIFIC ATION NUMBER U S. NUCLE AR REGULATORY CCMMISSION 3eVenf7)
~
WASHINGTON. O.C. 70555 O NEW IOC MODIF IC AT IO N OTHE R (Specifvl NOTIFICATION OF CONTRACT EXECUTION CONTRACT BASED ON:
Darrell Eisenhut.lcdm
/l,r* ~/ r" AUTHORIZATION NUMBER To:
RFPA 78-150 Division of Operating Reactors DATE
,J'g(Organaatson) u G vt. F
- 6 CONTR ACT CH ANGES PER THIS ACTION Allen F. G1agol"a
/-v-PG pg gy.
(Contract Speerabst)
(Oatei Correction in Article III Obligation of Funds.
Technical Assistance Contracts Branch OlVfSION OF CONTRACTS, ADM CONTR ACTOR (Name 3 L ocation/
EXECUTICN DATE 12/28/79 Nathan M. Newmark rveeOFCONTRACT Crbana, IL 61801 Time and Material PERIOD OF PERFORM ANCE PROJECT TITLE Technical Assistance in Reviewing the Original 8/21/78 - 9/30/80 Seismic Design Bases and Design Bases for PRINCIPAL INVESTIG ATOR Operating Plants Nathan M. Newmark NRC AUTHORIZED REPRESENTATIVE Howard A. Levin B&R NUMBER FIN NUMBER AMOUNT N/A N/A NEW NRC FUNOS 100.000.00 FUNOING S
100.000.00 TOTAL FY gg. FUNDING TOTAL NRC OBLIGATIONS A TT ACH ME N TIS);
GOVERNMENT PROPERTY CONTRACT COCUMENT I NRC FORM 255 (10L 76) 1765 324 8001180 3 0