Forwards QA Program APL-TOP-1A,Revision 5,changing Description of Position of QC Supervisor & Correcting Typographical Errors
ML19211D266
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/09/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Haass W
Office of Nuclear Reactor Regulation
References
1-010-14, 1-10-14, NUDOCS 8001170375
Download: ML19211D266 (3)


Text

}

7, m ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501)371-4000 January 9,1980 1-010-14 2-010-12 Mr. Walter P. Haass, Chief Quality Assurance Branch Division of Project Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Quality Assurance Program TOPICAL Report (APL-TOP-1A Rev. 5)

(File: 1510.1, 2-1510.1, 0233.1)

Reference:

1) Letter W.P. Haass to D. Trimble dated 12/5/79 regarding APL-TOP-1A Rev. 5

Dear Mr. Haass:

Enclosed are twenty-five copies of affected page changes to APL-TOP-IA Rev. 5 as requested. The staff positions forwarded by the refer-enced letter have been addressed. Attachment 1 provides a cross reference between the staff positions of reference 1 and the page number where the revised response is contained. As discussed with your Mr. Conway on 12/18/79, additional changes have been made as follows:

A. The previous position of QC Supervisor has been changed to Manager of Nuclear Quality Control. This change has been reficcted throughout the manual.

B. Typographical errors have been corrected where detected. This includes changing Executive Director-G6C to Vice President-GSC in those paragraphs which were not updated during our June 11, 1979 submittal.

C. Appendix A, page 13, has been changed to show that the Pre-construction Verification interpretation applies to ANSI N45.2.8 in addition to ANSI N45.2.4 which was previously listed.

8001170 3 7 5 f.*EMEaE A M COLE SOUTH UTILITIES SYSTEM .

January 2, 1980 Mr. Walter P. Ilaass D. Paragraph 4.2.2(4) has been changed to better align with ANSI N45.2.13 and the reference to ANO-19, which was previously in paragraph 4.2.2(4),is now in 4.2.2(1).

E. The last three sentences of paragraph 7.2.1 of Section 7 have been deleted as this information is redundant to that of Appendix A, page 29, item 3.

In our 6/11/79 submittal to you, we discussed the possibility that ANO implementing procedure titles and numbering could be changing. We have concluded that these changes are necessary in order to effectively implement the requirements of APL-TOP-1A revision 5. These changes will be included in a future revision of the TOPICAL.

Sincerely,

&0Y David C. Trimble Manager, Licensing DCT:pw Attachment cc: Messrs. D. A. Rueter Nithout/att.

D. R. Sikes Without/att.

J. M. Griffin Without/att.

J. P. O'Hanlon Without/att.

B. L. Bata Without/att.

1762 236

ATTACHMENT 1 STAFF POSITION PAGE/ PARAGRAPH CONTAINING RESPONSE 421.62 Section 5, Page 2, Paragraph 5.2.6 421.63 Appendix A - Page 1, Item 3 421.64 Appendix A - Page 3, Item 1 421.65 Appendix A - Page 15. Our exception to section 4.6 of ANSI N45.2.5 has been deleted. Finishes will be inspected.

421.66 Appendix A - Page 17. Our exception to section 5.1 of ANSI N45.2.5 has been deleted. When grouting is performed, in process testing of the grout on a daily basis will be performed.

421.67 Appendix A - Page 18. Our exception to section 5.2 of ANSI N45.2.5 has been deleted. The com-posite of each shipment will be tested for chemical composition, pH, and specific gravity in accordance with ASTM C-494.

421.68 Per the telecon between our L. Humphrey and your J. Conway on 12/18/79, no response is necessary.

We presently do not have a position of QA Supervisor (Nuclear), nor does the QA organi-zation chart show the position. We wish to have the general information in paragraph 1.4.1.1.2.1 and 1.4.1.1.2.3 in case a Quality Assurance Supervisor (Nuclear) is added in the future.

11762~237

TABLE OF CONTENTS ARKANSAS POWER & LIGHT COMPANY SECTION SUBJECT TAB PAGE POLICY STATEMENT FORWARD TERMS AND DEFINITIONS

1. ORGANIZATION 1 1

1.1 SCOPE 1 1.2 ARKANSAS POWER & LIGHT COMPANY 1 1.3 SUPPORTIVE SERVICES 1 1.3.1 MANAGER OF SAFETY 1 1.3.2 SUPERVISOR OF PURCHASING 1 1.4 GENERATION AND CONSTRUCTION 2 1.4.1 DIRECTOR, TECHNICAL & ENVIRONMENTAL SERVICES 2 1.4.1.1 QUALITY ASSURANCE ORGANIZATION (QAO) 3 1.4.2 DIRECTOR, PROJECTS MANAGEMENT 6 1.4.3 DIRECTOR, GENERATION OPERATIONS 6 1.4.4 DIRECTOR, GENERATION ENGINEERING 7 1.4.5 DIRECTOR, ADMINISTRATIVE SERVICES & PROJECT SUPPORT 7 1.5 ARKANSAS NUCLEAR ONE ORGANIZATION 8 1.5.1 GE' iRAL MANAGER 8 1.5.2 OPERATIONS & MAINTENANCE MANAGER 8 1.5.3 ENGINEER & TECHNICAL SUPPORT MANAGER 10 1.5.4 PLANT ADMINISTRATION MANAGER 12 1.5.5 MANAGER OF NUCLEAR QUALITY CONTROL 12 1.6 OUALITY PROGRAM COMMITTEES 13 1.6.1 SAFETY REVIEW COMMITTEE 13 1.6.2 PLANT SAFETY COMMITTEE 16 1.7 ORGANIZATIONAL INTERFACES AND RESPONSIBILITIES 18

2. OUALITY ASSURANCE PROGRAM 2 1 2.1 SCOPE 1 2.2 PURPOSE 1 2.3 2.4 APPLICABILITY PROCEDURES

)[h2 2)h 1 3

2.5 PROGRAM REVISION AND CONTROL 2.6 SYSTEM STRUCTURE AND C 2.7 TRAINING AND PERSONNEL 2.8 PROGRAM REVIEW DUPLICATE DOCUMENT Entire document previously entered into system under:

) QUALITY ASSURANCE MANUA ANO

[W ) TITLE: TABLE OF CONTEh N o. of pages: />

.