Forwards LER 79-050/01T-0
Date released: 08/13/2019 Download: ML19211D253


LER 79-050/01T-0:on 791227,during Field Insp,Discrepancies Noted Between as-designed & as-built Location of Seismic Support on Injection Lines from Accumulators 2 & 3.Piping Modified & Addl Hangar Installed