ML19211D140
| ML19211D140 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/10/1980 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC COMMISSION (OCM) |
| References | |
| PM-80-12, NUDOCS 8001160546 | |
| Download: ML19211D140 (1) | |
Text
.
Genga Power Cornpany Post Othee Box 442 Baxley. Georgia 31513 Telegnone 912 367-7781 912 537-9444 m
Georgia Power Edwin I. Hatch Nuclear Plant t% scuttwo esttrc s, stem Janaury 10, 1980 PM-80 12 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-366 Office of Plans and Schedules Directorate of L t ensing U.S. Nuclear Regulatory Co=nission Washington, D.C.
20545
Dear Sirs:
Pursuant to Section 6.9.1.6 of the Hatch Unit 2 Technical Specifications, please find attached the NRC Monthly Operating Repert.
_ h Manry Plant Manager MM/pebo xc:
R. F. Rogers C. T. Moore T. V. Greene File 175 141 jfo 4,l s
Ss j 800116o 5%
OPERATING DATA REPORT 50-366 DOCKET NO. l~-10-60 DATE CO.\\lPLETED !!Y J. W. Hoden TELEPilONE 912-367-7781 OPERATING STATUS llatch 2 Notes
- 1. Unit Name:
- 2. Reporting Period:
December 1979
- 3. Lies wd Thermal Power (41Wt): 2436 MWt
- 4. Naceplate Rating (Gross SIWE):
817.0 Gross MWe
- 5. Desi;n Electrical Rating (Net 31We):
784.0 Net MWe
- 6. Staumum Dependable Capacity (Gross 5tWe): 782.0 Gross MNe 749.0 Net MWe
- 7. Slacnum Dependable Capacity (Net 51We):
- 5. If Charges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Lese! To Which Restricted. If Any (Net 31We):
- 10. Remns For Restrictions.lf Any:
This 5f onth Yr..to.Date Cumulatise 744 2833 2833
- 11. Hot::s in Reporting Period
- 12. Nucher Of Hours Reactor Was Critical 744.0 2663.5 2663.5
- 13. Reanor Resene Shutdown Hours 0.0 0.0 0.0
- 14. Ilo:::s Generator On.Line 744.0 2414.b 2414.5
- 15. Unit Resene Shutdown Hours 0.0 0.0 0,0
- 16. Grom Thenn.d Energy Generated (51WH) 1793810 5494062 5494062 612090 1835960 1835960 1-Gros Ele ctrical Energy Generated (5th H) 1757137 1757137
- 15. Net E!ectrical Energy Generated (31WII) 588617
- 19. Unit Senice Factor 100.0 85.2 85.2
- 20. Unit Asailability Factor 100.0 85.2 85.2
- 21. Unit Capacity Factor (Using.\\lDC Net) 105.6 82.8 82.8
- 22. Unit Capacity Factor (Uning DER Net) 100.9 79.1 79.1
- 23. Unit Forced Outage Rate 0.0 10.6 10.6
- 24. Shut.fowns Seheduled Oser Next 6 5fonths (Type. Date..md Duration of Each):
Vent Header Deflector and Surveillance Outage, March 1 to April 13 25 f f Sbt Down \\t End Of Report Period. Estimated Date o
- o. Unii,In Tesi status (Prior to Commercial Operation):
DUPLICATE DOCUMENT INITIA L CRITICAL.!TY Entire document previously INITI \\L ELECTRICITY entered into system under:
CO\\l\\tERCI A L OPER A TION bf Q
ANO I
af n2
.g No. of pages:
,