ML19211D140

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1979
ML19211D140
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/10/1980
From: Manry M
GEORGIA POWER CO.
To:
NRC COMMISSION (OCM)
References
PM-80-12, NUDOCS 8001160546
Download: ML19211D140 (1)


Text

. .

Genga Power Cornpany Post Othee Box 442 Baxley. Georgia 31513 Telegnone 912 367-7781 912 537-9444 m

Edwin I. Hatch Nuclear Plant Georgia Power t% scuttwo esttrc s, stem Janaury 10, 1980 PM-80 12 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-366 Office of Plans and Schedules Directorate of L t ensing U.S. Nuclear Regulatory Co=nission Washington, D.C. 20545

Dear Sirs:

Pursuant to Section 6.9.1.6 of the Hatch Unit 2 Technical Specifications, please find attached the NRC Monthly Operating Repert.

_ h Manry -

Plant Manager MM/pebo xc: R. F. Rogers C. T. Moore T. V. Greene File 175 141 s

jfoSs4,l j

800116o 5%

OPERATING DATA REPORT 50-366 DOCKET DATENO. l~-10-60 CO.\lPLETED !!Y J. W. Hoden TELEPilONE 912-367-7781 OPERATING STATUS

1. Unit Name: llatch 2 Notes
2. Reporting Period: December 1979
3. Lies wd Thermal Power (41Wt): 2436 MWt
4. Naceplate Rating (Gross SIWE): 817.0 Gross MWe
5. Desi;n Electrical Rating (Net 31We): 784.0 Net MWe
6. Staumum Dependable Capacity (Gross 5tWe): 782.0 Gross MNe
7. Slacnum Dependable Capacity (Net 51We): 749.0 Net MWe
5. If Charges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Lese! To Which Restricted. If Any (Net 31We):
10. Remns For Restrictions.lf Any:

This 5f onth Yr..to.Date Cumulatise

11. Hot::s in Reporting Period 744 2833 2833
12. Nucher Of Hours Reactor Was Critical 744.0 2663.5 2663.5
13. Reanor Resene Shutdown Hours 0.0 0.0 0.0
14. Ilo:::s Generator On.Line 744.0 2414.b 2414.5
15. Unit Resene Shutdown Hours 0.0 0.0 0,0
16. Grom Thenn.d Energy Generated (51WH) 1793810 5494062 5494062

1- Gros Ele ctrical Energy Generated (5th H) 612090 ,

1835960 1835960 '

15. Net E!ectrical Energy Generated (31WII) 588617 1757137 1757137 -
19. Unit Senice Factor 100.0 85.2 85.2
20. Unit Asailability Factor 100.0 85.2 85.2
21. Unit Capacity Factor (Using .\lDC Net) 105.6 82.8 82.8
22. Unit Capacity Factor (Uning DER Net) 100.9 79.1 79.1
23. Unit Forced Outage Rate 0.0 10.6 10.6 ,
24. Shut.fowns Seheduled Oser Next 6 5fonths (Type. Date..md Duration of Each):

Vent Header Deflector and Surveillance Outage, March 1 to April 13 25 f f Sbt Down \t End Of Report Period. Estimated Date o

o. Unii,In Tesi status (Prior to Commercial Operation):

DUPLICATE DOCUMENT INITIA L CRITICAL.!TY Entire document previously INITI \L ELECTRICITY entered into system under:

CO\l\tERCI A L OPER A TION ANO bf QI af n2 - -

No. of pages:

.g

,