ML19211C213

From kanterella
Jump to navigation Jump to search
Notifies ASLB That Publication Date for Suppl 3 to SER Re OPS Floating Nuclear Power Plants Cannot Be Established Due to Preparation for ACRS Subcommittee Meeting on Core Ladle Design
ML19211C213
Person / Time
Site: Atlantic Nuclear Power Plant PSEG icon.png
Issue date: 12/04/1979
From: Sohinki S
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Bright G, Schink D, Wolfe S
Atomic Safety and Licensing Board Panel
References
NUDOCS 8001110068
Download: ML19211C213 (2)


Text

pa arc

+

o UNITED STATES

[3) (h NUCLEAR REGULATORY COMMISSION 3,

,oj WASHINGTON, D. C. 20555

" 'Q December 4,1979 Sheldon J. Wolfe, Esq., Chairman Glenn 0. Bright, Esq.

Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commissjon Washington, DC 20555 Washington, DC 20555 Dr. David R. Schink Department of Oceanography Texas A & M University College Station, Texas 77840 In the Matter of Offshore Power Systems (Floating Nuclear Power Plants)

Docket No. STN 50-437 Gentlemen:

During the hearing session held in the captioned matter on November 2,1979, this Board ordered the Staff to report to it on November 30, 1979, concerning the schedule for issuance of Supplement 3 to the Safety Evaluation Report (SER).

The undersigned is in receipt of the attached memorandum from the Licensing Project Manager for this application; the memorandum is self-explanatory.

As a result of the Comission's action taken subsequent to the November 2 hearing session and the difficulty in scheduling a meeting of the full ACRS cormlittee, we cannot, at this time, provide the Board with a publication date for the next SER supplement. Although we are unable to provide an exact number of man-hours spent on this application subsequent to the Comission's action, the undersigned has been informed that, due to preparation for the ACRS subcommittee meeting held earlier this month to discuss the core ladle design, the Staff has devoted more resources to this application than to any other pending application for a con-struction nermit.

Finally, the undersigned has been informed that the impacts to the OPS schedule which are described in the attached memorandum are being felt in the Staff's review of all other construction permit applications.

1738 021 goei,,o M

As soon as the Staff is able to establish a new publication date for the next SER supplement, we will so notify the Board.

Sincerely,

'I I

M 4

Stephe M. Sohinki Counsel for NRC Staff Attachment As Stated cc w/ attachment:

Vincent W. Campbell, Esq.

Dr. David L. Hetrick Richard M. Hluchan, Esq.

David S. Fleischaker, Esq.

Mary M. Cheh, Esq.

Barton Z. Cowan, Esq.

Thomas M. Daugherty, Esq.

Mr. John H. Williamson City of Brigantine Harold P. Green, Esq.

Carl Valore, Esq.

Dr. Willard W. Rosenberg Dr. Glenn L. Paulson Mr. Harold P. Abrams Mr. Mitchell Attalla Keith A. Onsdorff, Esq.

Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Docketing and Service Section 1738 022

pn nsauq

[

p UNITED STATES g

y m

g NUCLEAR REGULATORY COMMISS!ON 7

c C WASHINGTON, D. C. 20555 s

5

%.w... y NOV 2 8 1979

+

Docket No. STN 50-437 e

/ MEMORANDUM FOR Steven M. Schinki, Office of the Executive Legal Director THRU:

Robert L.

ief, Light Water Reactors Branch No. 2, DPM FROM:

Ralph A. Birkel, Project Manager, Light Water Reactors Branch No. 2, DPM

SUBJECT:

REVIEW SCHEDULE FOR 0FFSHORE POWER SYSTEMS ML APPLICATION This is to inform you that pursuant to the Connission's decision to delay and not grant any operating or construction (manufacturing) licenses until it adopts new safety, siting and emergency standards, the issue date of the final supplement to the FNP SER in March 1980 as announced to the ASLB on November 2, 1979 is in jeopardy. i'anpower within NRR is being directed towards synthesizing a statement of goals and commensurate action plans based upon the recommendation -

and comments from the Keme,'y Comission Report, ACRS letters, the forthccming Rogovin Report and Congressional concerns as well as other sources. The out-growth of these efforts will provide a basis for the Cormission to resume our licensing efforts albeit using new standards. These standards will be applied to the OPS application.

During this period, the extent of the staff review of the OPS application will probably be limited and will depend on the availability of manpower resources considering the activities described above and other staff reviews.

In addition our anticipated meeting with the full ACRS Comittee in December 1979 has been postponed until some time next year.

JpL d.lidDL alph A. Birkel Light Water Reactors Branch No. 2 Division of Project Maragement ccs:

D. Vassallo R. Mattson ar C. Haupt 9 fl22MY 6

go C73

~

1738 023