ML19211A890
| ML19211A890 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 11/29/1979 |
| From: | Gillespie F, David Jones, Todd G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19211A885 | List: |
| References | |
| 70-1151-79-15, NUDOCS 7912210235 | |
| Download: ML19211A890 (1) | |
Text
'
MATE!At TF.?.!'S"!TTED l'TCTITH 00:ITl.!:;3 2.E:;. 6....J.T.3:1 u,
UNITED STATES o,,
8 NUCLEAR REGULATORY COMMISSION o
g REGION 11 o
101 MARIETTA ST., N.W., SUITE 3100 o
ATLANTA, G EORGIA 30303 Report No. 70-1151/79-15 Docket No. 70-1151 License No. SNM-1107 Safeguards Group III Licensee: Westinghouse Electric Corporation Drawer R Columbia, South Carolina 29250 Facility Name: Columbia Nuclear Fuel Plant Inspection at: Columbia, South Carolina Inspection Conducted: September 11-14, 1979 Date of Last Material Control and Accounting Inspection Visit:
September 6 & 7, 1979 Type of Inspection: Unannounced Material Control & Accounting Inspectors:
h
///pt/7f
, verr D. W, Jones Date M
N 4L/A' T
/
/
'Datd Approved by:
f(/M F. P. GillWpit, Chfe'f,/ MC&A Section,
'Date Safeguards Branch Inspection Summary:
Areas Inspected:
Inventory difference and its associated limit of errors, shipping and receiving, records and reports, and followup on items of noncom-pliance.
The inspection involved 48 inspector-hours on site by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the four areas examined during the inspection.
S-re 79 -
/// R Copy of Ccpics
,4 Pc-eS Th i.- L e m"--"
O m' te M 6
98 rerrcence^ ' '
..c_xcific crrrc :r.1 C ::-:I II. ATE!?.t Tn?.':{.!TTJD ljyNH 7912210 CL::Tl.U, S 2.7-s.......tIGl