ElectricTower PO Box 1700 HoustortTexcs77001 December 20, 1979 AC-Ill-AE-381 Mr. Ilarold R. Denton, Director Office of Nuclear Reactor Regulation Nucicar Regulatory Commission Washington, D.C.
20555
Dear Sir:
Allens Creek Nuclear Generating Station Unit 1 Docket No. 50-466 Amendment 54 Please find under separate cover sixty (60) copies of Amendment 54 to the flouston Lighting 6 Power Company Allens Creek Nuclear Generating Station Unit 1 PSAR. A copy of this transmittal 1ctter is attached to each amendment copy. Also, please find under separate cover five (5) copies of Revision 2 of the Allens Creek Containment Structures Design Report (CSDR).
Amendment 54 consists of additional PSAR information updating the PSAR to make it consistent with Revision 2 of the CSDR.
Revision 2 of the CSDR incorporates the latest containment load definition information from General Electric and documents a design change to the containment which makes the dome of the containment hemispherical instead of semic11ipsoidal. All safety analyses depending on containment volume remain conservative.
Very truly yours, 0
FC R. lW.
E. A. Turner Vice President Power Plant Construction 6 Technical Services LDR/ngb cc: