ML19211A852

From kanterella
Jump to navigation Jump to search
Forwards Containment Structures Design Rept,Revision 2 Incorporating GE Load Definition Info & Documenting Design Change to Containment Dome
ML19211A852
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 12/20/1979
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To: Denton G
Office of Nuclear Reactor Regulation
Shared Package
ML19211A855 List:
References
AC-HL-AE-382, NUDOCS 7912210188
Download: ML19211A852 (1)


Text

Houston r

company Electric Tower RQ Box 1700 Houston. Texas 77001 December 20, 1979 AC-IIL- AE-382 Mr. Ilarold R. Denton, Director Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Allens Creek Nuclear Generating Station Unit 1 Docket No. 50-466 Containment Structures Design Report - Revision 2 Please find under separate cover five (5) copies of Revision 2 of the Allens Creek Containment Structures Design Report (CSDR).

Revision 2 of the CSDR incorporates the latest containment load definition information from General Electric and documents a design change to the containment which makes the dome of-the con-tainment hemispherical instead of semiellipsoidal. All safety analyses depending on containment volume remain conservative.

Very truly yours, d

y.k m E. A. Turner Vice President Power Plant Construction S Technical Services LDR/ngb cc: J. G. Copeland (Baker S Botts)

R. Gordon Gooch (Baker S Botts)

J. R. Newman (Lowenstein, Newman, Reis, Axelrad S Toll)

P. A. Ilorn All Parties

}h3k }54 7 912210 l 98( ,