IE Insp Repts 70-0135/79-06 & 70-0364/79-09 on 790305-0427. Noncompliance Noted:Failure to Maintain Required Number of Armed Guards at Apollo Facility
ML19211A556
Person / Time
Site: 07000135, 07000364
Issue date: 09/24/1979
From: Joyner J, Kushner W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19211A550 List:
References
70-0135-79-06, 70-0364-79-09, 70-135-79-6, 70-364-79-9, NUDOCS 7912200100
Download: ML19211A556 (16)


Text

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I 70-135/79-06 Report No.

70-364/79-09,70-135 Docket No.70-364 SNM-145 Safeguards Group 1

License No.

SNM-414 Priority 1

Category UR-PU Licensee:

Babcock and Wilcox Comoany P.O. Box 1260 Lynchburg, Virginia 24505 Facility Name:

Nuclear Materials and Manufacturing Division - Pennsylvania Operations Inspection At:

Aoollo and Parks Township, Pennsylvania, Facilities Inspection Conducted:

March 5 to April 27, 1979 Inspectors:

lA), [ b 6 kN 7/2 4-/79 W. L. Kushner, ResignYFuel Facility Inspector

/

da'te date date Approved by

~

h>W cf/2,&/79

/

H'jdojnerg Chief, Nuclear Material Control

/ date Supptfrt Section, Safeguards Branch Inspection Summary:

Inspection on March 5 to April 27, 1979 (Combined Report Nos. 70-135/79-06 and 70-364/79-09)

Areas Inspected:

Routine inspection by the resident inspector of nuclear material control and accounting, physical security and health and industrial safety.

The inspection involved 103 inspector-hours onsite by the resident inspector.

Results:

Of the three areas inspected, one apparent item of noncompliance was identified in one area (Infraction - failure to maintain required number of armed guards at the Apollo facility, Paragraph 3)

THE INFORMATION ON THIS PAGE IS DEEMED TO BE APPROPRIATE FOR PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.790 1632 280 Region I Form 167 (August 1979) 7 9122001u0

REPORT DETAILS 1.

Persons Contacted

  • M. A. Austin, Manager, Technical Control
  • E. L. Bellisario, Manager, Nuclear Material Control and Accounting J. M. Shields, Manager, Security E. M. Benson, Manager, Plutonium Plant Re V. Carlson, Manager, Uranium Plants The inspector interviewed, or was in contact with, numerous licensee employees of all aspects of the Pennsylvania Operations.
  • Denotes those present at the weekly Resident Inspector / licensee manage-ment meeting.

2.

Licensee Action on Previous Inspection Findings THIS PARAGRAPH INTENTIONALLY LEFT BLANK; IT CONTAINED 10 CFR 2.790 INFORMATION - NOT FOR PUBLIC DISCLOSURE.

1632 281

PAGES 3 through 12 HAVE BEEN INTENTIONALLY LEFT BLANK; THEY CONTAINED 10 CFR 2.790 INFORMATION - NOT FOR PUBLIC DISCLOSURE.

1632 282

13 6.

Health and Industrial Safety a.

Housekeeping Controls,

(1) Disposable materials and debris are promptly moved to collec-tion areas for disposal.

(2)

Excess combustible materials are removed to authorized stor2'e areas.

b.

Operations Review (1) Health and safety procedures were reviewed and found to be cur-rent and available to operators in plant areas.

(2) Authorized posted criticality limits and fissile material accu-mulation records were inspected to insure that limits were not exceeded.

c.

Environmental Programs (1) This was inspected to assure that required equipment was installed and operating.

Samples are collected in designated locations and equipment has been calibrated in the proper time frame (Refe.rence Combined Inspection Report 70-135/79-05 and 70-364/79-c3).

d.

Radiation Protection (1)

Survey instruments were located at personnel egress points from process areas.

(2) Air sampling equipment in process areas was in operation.

7.

Independent Inspection Effort The inspector, while in plants or during discussions with Pennsylvania a.

Operations personnel, observed adherence to general industrial and health and safety practices, including use of safety glasses, face masks, respirators, attention to change lines and proper self checks by persons for contamination.

Attitudes and knowledge of personnel performing functions related to plant operations from the standpoint of safety and safeguards control were also observed.

b.

Discussions were held with the licensee regarding controls over the laundry facility and the " gas lab", which are located in a separate building adjacent to the Apollo plant.

The facility was inspected to assure proper health and safety postings and controls.

The " gas lab" is an extension of MBA-22 (Chemistry Lab).

1632 283

14 THIS PARAGRAPH INTENTIONALLY LEFT BLANK; IT CONTAINED 10 CFR 2.790 INFORMATION - NOT FOR PUBLIC DISCLOSURE.

c.

Inspection tours were also conducted of various plant perimeters, such as unrestricted areas, to assure they were free of possibly contaminated items.

Refer to Combined Inspection Report 70-135/

79-08 anh 70-364/79-12.

d.

THIS PARAGRAPH INTENTIONALLY LEFT BLANK; IT CONTAINED 10 CFR 2.790 INFORMATION - NOT FOR PUBLIC DISCLOSURE.

~

1632 284

15 THIS PARAGRAPH INTENTIONALLY LEFT BLANK; IT CONTAINED 10 CFR 2.790 INFORMATION NOT FOR PUBLIC DISCLOSURE.

f.

Licensee actions during an evacuation of the Apollo site at 1:40 p.m.

on April 24 were observed by the inspector.

The evacuation was caused by a criticality alarm that activated while being repaired.

The evacuation and resultant search of the evacuation routes and assembly point were performed according to procedure.

8.

General a.

The following regional based inspectors inspected B&W facilities during this period:

March 5-9:

P. Bissett March 13-16:

P. Clemons March 26-30:

H. Zibulsky, D. Holody April 9-13:

A. Della Ratta, P. Bissett April 16-20:

G. Smith THIS PARAGRAPH INTENTIONALLY LEFT BLANK; IT CONTAINED 10 CFR b.

2.790 INFORMATION NOT FOR PUBLIC DISCLOSURE.

I 1632 285

16 9.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompli-ance or deviations.

An ungesolved item disclosed during this inspection is discussed in Paragraph ed.

10.

Exit Interview The Resident Inspector met with the Manager, Pennsylvania Operations, frequently during this inspection period to discuss items of mutuai con-cern, the contents of this report and the identified item of noncompliance.

Also, on April 11, 1979, the Resident Inspector met with the Manager, Pennsylvania Operations, to discuss a letter received by B&W containing allegations made by a facility employee.

The licensee was advised that this letter would be transmitted to the Region I office for action.

Subsequently the alleger refused to talk to the NRC.

An Inquiry conducted at the B&W facility failed to substantiate any of the allegations.

1632 286

.