Notifies That Evaluation of Fire Protection Program Delayed Until Util Provides Required Info.Nrc Is Preparing Order to Shutdown Facility Until Liquefaction Issue Is Resolved
ML19211A520
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/29/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7912200057
Download: ML19211A520 (1)


Text

{

e uc

'g UNITED STATES E'

NUCLEAR REGULATORY COMMISSION g

. t WASHINGTON, D. C. 20555 NOV 2 91979 MEMORANDUM FOR:

D. Ziemann, Chief, Operating Reactors Branch #2, D0R FROM:

G. Lainas, Chief, Plant Systems Branch, D0R

SUBJECT:

FIRE PROTECTION EVALUATION - LACROSSE Facility: Lacrosse Boiling Water Reactor (LACBWR)

Licensee:

Dairyland Power Cooperative Docket No.:

50-409 Responsible Branch: ORB #2 Project Manager:

J. Shea Review Branch: Plant Systems Status: Ser issued, evaluation of incomplete items is on-going As we discussed on November 20, 1979, the completion of our Evaluation of the fire protection program at this facility has been delayed because (1) the licensee has not provided the information we require to complete this review, (2) we are preparing an order to shutdown the facility until the liquefaction issue is resolved, and (3) we expect the facility to be shutdown for an extended period. We will not resume this evaluation until the licensee provides the required infonnation.

We suggest the order include a requirement that all fire protection modifications be implemented before the end of the proposed shutdown period.

g....,

ki 4C>d h-G. Lainas, Chief Plant Systems Branch Division of Operating Reactors

Contact:

T. Lee X-27878 cc:

D. Eisenhut T. Lee B. Grimes J. Shea R. Vollmer V. Benaroya 1W ON G. Lainas R. Hall (BNL)

R. Ferguson E. MacDougall (BNL)

T. Wambach J. Klevan (Consultant)

Of7 g 7912200