Forwards QA Program Insp Rept 99900650/79-01 on 791015-17 & Notice of Deviation
ML19211A385
Person / Time
Issue date: 11/07/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Peshek C
AMERICAN INSTITUTE OF STEEL CONSTRUCTION, INC.
Shared Package
ML19211A366 List:
References
REF-QA-99900650 NUDOCS 7912180132
Download: ML19211A385 (2)


Text

-.. _ _....

GenMx UNITED STATES

/gn neog%,

NUCLEAR REGULATORY COMMISSION 3

REGloN IV

^

E) 611 RY AN Pt. AZA DRIVE. SUITE 1000 5.j(;

Oj ARLINGTON, TEXAS 76012 o, -

'% +.... /g

'lMQV'W Docket No. 99900650/79-01 American Institute of Steel Construction, In:..

ATTN:

Mr. Charles Peshek, Jr.

Director Quality Certification The Wrigley Building 400 North Michigan Avenue Chicago, Illinois 60611 Gentlemen:

This refers to the QA program inspection conducted by Mr. Ross L. Brown of this office on October 15-17, 1979, of your facility at Chicago, Illinois and to the discussions of our findings with you and others at the conclusion of of the inspection.

Areas examined during the QA Program inspection aw'. out findings are discussed in the enclosed report. Within these areas, the inspection consisted cf an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During this inspection it was found that the implementation of your QA Program failed to meet certain commitments in your Topical Report No. FCTPN-78.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter. These identified deviations app'e'ar to rep-resent a number of similar discrepancies in the implementation of the program described in your topical report, therefore it will be necessary that you review your procedures, instructions and records to assure compliance with the commitments in your topical report.

Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recur-rence, and (3) the dates your corrective actions and preventive measures were or will be completed.

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room. If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.

Any such application c:ust include a full 1607 255 t

791218013 2_

7.... -.

2 state =ent of the reasons on the basis of which it is claimed that the information is preprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Uldis Potapovs, Chi f Vendor Inspection Branch

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900650/79-01 s