7 Z C-l OUISIANA
,42 oetAnoNoe stater POWER & L1GHT P O. Box 6008 = NEW ORLEANS. LOUISIANA 70174. (504) 366-2345 EuSbE YS October 16, 1979 a t. aswett Vice Presdent-Power Producten LPL 11210 Q-3-A20.03.14 3-A1.01.04 Mr. Karl V. Seyfrit Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 I. E.Bulletin 79-14 I. E.Bulletin 79-14 (Suppl. 2)
Dear Mr. Seyfrit:
Installation of the various safety related/ seismically supported piping systems is currently in progress. As systems or portions of systems, i.e.,
piping between pipe anchors or other convenient piping / support groups, are completed, the piping contractor will verify by actual measurements, the as-built support locations. Deviations to design are recorded and submitted in accordance with existing procedures.
In addition, a functional verification of supports will be performed by the Architect Engineer's Stress Group prior to system turnover. Deviations from design locations or concerns about functional capability are reviewed by the Architect Engineer and an "as-built" stress analysis is performed as required. Any corrective action required by the revised analysis will be completed prior to system turnover from the Architect Engineer to LP&L.
If you have any questions, please advise.
Yours very truly, 0 /43adi 1592 356 4
D. L. Aswell Vice President-Power Production DLA:JFK:bar cc: Director, Office of Inspection and Enforcement Director, Division of Operating Reactors, Office of Nuclear Reactor Regulation 7 91217 o 3Q
'