ML19211A280

From kanterella
Jump to navigation Jump to search
Forwards LER 79-097/03L-0
Date released: 08/13/2019 Download: ML19211A280


LER 79-097/03L-0:on 791128,after Recalibr of P33-P001A & B During Steady State Power Operation,Drywell Torus Dihydrogen & Dioxide Analyzers a & B Indicated More than 4% Oxygen Concentration.Caused by Leakage of Air Into Analyzer
ML19211A290
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/11/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19211A290 (2)
Forwards LER 79-097/03L-0
ML19211A278
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/11/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19211A278 (1)