ML19211A250

From kanterella
Jump to navigation Jump to search
Forwards LER 79-021/03L-0 & Updated LER 79-012/03X-1
Date released: 08/13/2019 Download: ML19211A250


Updated LER 79-012/03X-1:on 790810,leak Rate Testing of Reactor Bldg Purge Valves at Penetration V-1 Indicated Leak Rate in Excess of Tech Spec Limits.Caused by Maladjusted Valve Seat Shims.Leak Rate Test Performed
ML19211A255
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/06/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19211A255 (1)
LER 79-021/03L-0:on 791115,while Securing Makeup & Purification Sys,Inside Containment Isolation Seal Return Valve Failed to Fully Close on Demand.Caused by Valve Operator Torque Switch Failing to Make Up.Switch Replaced
ML19211A252
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/06/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19211A252 (1)
Forwards LER 79-021/03L-0 & Updated LER 79-012/03X-1
ML19211A249
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/06/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19211A249 (1)