Monthly Operating Rept for Nov 1979
ML19211A214
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/14/1979
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19211A208 List:
References
NUDOCS 7912170203
Download: ML19211A214 (11)


Text

'. ,

AVER AGE DAILY UNIT POWER LEVEL

~

DOCKET NO.

UNIT ANO-2 DATE 12/14/79 R. A. Pendergraft COMPLETED BY TELEPHONE 501-968-2519 MONTH November 1979 _

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe. Net) 0 0 1 37 0 0 2 ig 3 n i9 0 0 20 0 4

0 0 5 21 6

0 22 n 0

7 23 0 24 0

8 9

0 25 n 0 0 10 26 0 27 0

11 0 ,g 0 12 0 0 13 29 14 0 30 0 0 NA 15 3 0

16 INSTRUCTIONS _

On this format,hst the average daily unit pov.cr leselin MWe Net for euh day in the reporting inonth. Compute to the nearest whole rnegawatt.

1591 003 nmi 77/ci7 0kD )

OPERATING DATA n EPORT DOCKET NO. 50-368 DATE 12/14/79 COMPLETED BY R. A. Pendergraft TELEPHONE 601 068 2519 OPERATING STATUS Notes Arkansas Nuclear One - Unit 2

1. Unit Name:
2. Reporting Period: November 1-30. 1979 2815
3. Licensed Thermal Power (MWII:

959

4. Nameplate Rating (Gross MWel:
5. Design Electrical Rating (Net MWel:

012

6. Maximum Dependable Capacity (Gross MWe):

NA NA

7. Maximum Dependable Capacity (Net Mhe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

None

9. Power Les el To which Restricted. If Any (Net MWel: None
10. Reasons For Restrictions. If Any: NA This Month Yr.-t o.f'a t e Cumularise 720,0 8016.0 8760.0 i1. Hours in ReportinFPeriod 0.0 2787.6 3222.5
12. Number Of Hour, Reactor was Criticat 0.0 2142.9 2285.1
13. Reactor Resene Shutdown Hours 0.0 2447.0 2499.8
14. Hours Generator On Line 0.0 21.7 21.7
15. Unit Resene Shutdown Hour, 0.0 2638959.0 2683537.0
16. Gross Thermal Energy Generated (MWHi 0.0 726523 0 732090_o
17. Gross Electrical Energy Generated iMWHI 0.0 648941.0 652925.0
18. Net Electrical Energy Generated (MWHi
19. Unit Senice Factor
20. Unit Asailability Factor
21. Unit Capacity Factor (Using MDC Neti NA Until Commercial Dooration__
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate d
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status iPrior to Commercial Operationi: Forecast Achiesed INITI A L CRITICA LITY

- 12/5/78 12/26/78 INITI A L ELECTRICITY Early 1980 -

COMMERCIAL OPER ATION 1591 004 c,m ,

. DATE: November 1979 REFUELING INFORMATION

1. Name of facility. Arkansas Nuclear One - Unit 2
2. Scheduled date for next refueling shutdown. 2/1/81
3. Scheduled date for restart following refueling. 4/1/81
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, .in general, will these be?

-If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

Yes, Description of. effects of new core loading

5. ' Scheduled date(s) for submitting proposed licensing action and supporting information. 12/1/80
6. Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

NONE

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 0
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present 486 increase size by 566

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE: 1989 1591 005

e DOCKET NO. 50-368 UNIT SillHDOWNS AND POWER Ill.DLICTIONS 2 UNITDATE NAhlE ]ANO-UnitT/14/79

, COhfPLETED ITY . R. A. Pendergraf t HEPORT htONTil Novrmher TEl.EPIIONE 501-968-2519 D

D C "i N 3 'E _), h" k Iicenser g -t,, _f q, ranse & corrective

,j y y No. Date g 3g  ; 1;vens v2 sq Attinn in Q F

$E 5 55: Repoit = 'E 0 E' Prevent fleenrrence M .

f M

d":=:P 79-22 10-4-79 5 720 11 2 NONE IF AIRDRY Loss of Instrument Air - ;cd Unit to trip on same day as scw M ed outage I was to occur. Outage was scheduled for Reactor Internals Inspection.

Outage continued from previous month.

LT1 4

O I 2 1 l O F: Forted Itcason: hiciliott: 1.stoliii G . Instnictions

& S: Sc hetf uleil A l;piipnu ni 17.nture (I xp.l.on) 1 - Man n.il f oi Picparation of Dat.

It. Maintenance or lest > Manual Scr.nn. I ntr> Sheets for I scemec C llefnelini; .t. Ant oin.iiic L s.nn. 1 vent Iteroit il l'Rii ile INtlRI G-Id 8 '") li' " ' i' ' " '" 'l O' he' (I 'P I ""I O l f'l i ID lter".itor Opcs li.iinuir & li. cnic l sannuation 1 -delttisilisti.Ill% C. .b

, G-Oper.iiional 1 in : f l.xpl on) I sintiin 1 Saine Siinice l')/17) 11 Other (1 spl.un)

NRC MONTIILY OPERATING REPORT OPERATING

SUMMARY

- NOVEMBER, 1979 UNIT 2 The unit has been shutdown for the complete month. k'hile shutdown, the Reactor Internals Inspection and Diesel Generator Replacement have been completed. Low Power Physics Testing has begun in pre-paration for returning the unit to power operation.

1591 007

.