ML19211A093
| ML19211A093 | |
| Person / Time | |
|---|---|
| Issue date: | 11/21/1979 |
| From: | Norian P NRC - TMI-2 BULLETINS & ORDERS TASK FORCE |
| To: | Ross D NRC - TMI-2 BULLETINS & ORDERS TASK FORCE |
| Shared Package | |
| ML19211A094 | List: |
| References | |
| NUDOCS 7912170023 | |
| Download: ML19211A093 (1) | |
Text
p aascoq
,f, jo, UNITED ST ATES e
o NUCLEAR REGULATORY COMM!sslON I
W ASHING TON, D. C. 20555 g
,/
MEMORANDUM FOR:
D.F. Ross, Jr., Director, Bulletins & Orders Task Force
[/p / P.E. Norlan, Analysis Group, Bulletins & Orders Task Force FROM:
THRU:
Z.R. Rosztoczy, Chief, Analysis Group, Bulletins & Orders Task Force
SUBJECT:
STATUS OF BABC0CK AND WILC0X LOFT L3-1 PRE-TEST CALCULATION A meeting was held in Lynchburg, Virginia on November 20,1979 to discuss the status of Babcock and Wilcox. ire-test calculation for the LOFT L3-1 ex,reriment.
Meeting minutes, which describe the status and additional evaluations to be performed by B&W, were prepared and signed by representa-tives from B&W and the NRC at the conclusion of the meeting. These meeting minutes are attached to this letter.
One microfiche copy of the B&W computer output (0 - 700 seconds) was given to the staff, and will be kept by J. Guttmann.
l
~
P.E. Norian Analysis Group Bulletins & Orders Task Force cc: T. Novak S. Israel W. Kane D. McPherson L. Phillips R. Landry J. Guttmann M. McCoy 1595 222 R. Capra
. Bailey, B&W DV RS
.