ML19210E998

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1979
ML19210E998
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/07/1979
From: Murray T
TOLEDO EDISON CO.
To: Volgenau E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19210E999 List:
References
L79-1170, NUDOCS 7912130373
Download: ML19210E998 (1)


Text

.

- @ ronoO Ga EDISON December 7, 1979 L79-1170 FILE: RR 2 (P-6-79-11)

Docket No. 50-346 License No. NPF-3 Dr. Ernst Volgenau, Director Office of Inspection and Enf occement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Doctor Volgenau:

Monthly Operating Report, November, 1979 Davis-Besse Nucient Power Station Unit 1 Enclosed find ten (10) copies of Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 for the month of November, 1979.

Also enclosed are revised pages of the Unit Shutdowns and Powerthe Reductions for numbering in the month of October,1979, which have been revised to correct the first column.

Yours truly, jr N Terry D. Murray Station Superintendent Davis-Besse Nucicar Power Station TDM/ljk Enclosures cc: Mr. James G. Keppler Regional Directer, Region III 1551 346 Mr. William G. Mcdonald, Director Of fice of Management Information and Program Control Encl: 2 EDISON FL, 'A 300 MADISON AVENUE TOLEDO, OH:0 43G52 THE TOLEDO EDl SON COMPANY (b 7012130 M3