ML19210E998
| ML19210E998 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/07/1979 |
| From: | Murray T TOLEDO EDISON CO. |
| To: | Volgenau E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19210E999 | List: |
| References | |
| L79-1170, NUDOCS 7912130373 | |
| Download: ML19210E998 (1) | |
Text
.
- @ ronoO Ga EDISON L79-1170 December 7, 1979 FILE: RR 2 (P-6-79-11)
Docket No. 50-346 License No. NPF-3 Dr. Ernst Volgenau, Director Office of Inspection and Enf occement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Doctor Volgenau:
Monthly Operating Report, November, 1979 Davis-Besse Nucient Power Station Unit 1 Enclosed find ten (10) copies of Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 for the month of November, 1979.
Also enclosed are revised pages of the Unit Shutdowns and Power Reductions for the numbering in the month of October,1979, which have been revised to correct the first column.
Yours truly, N
jr Terry D. Murray Station Superintendent Davis-Besse Nucicar Power Station TDM/ljk Enclosures cc:
Mr. James G. Keppler Regional Directer, Region III 1551 346 Mr. William G. Mcdonald, Director Of fice of Management Information and Program Control Encl:
2 THE TOLEDO EDl SON COMPANY EDISON FL, 'A 300 MADISON AVENUE TOLEDO, OH:0 43G52 (b
7012130 M3