ML19210E982

From kanterella
Jump to navigation Jump to search
Responds to IE Insp Rept 50-264/79-02.Corrective Actions: Reactor Operations Committee Met 790313,0802 & 1107 & Will Meet on 791211
ML19210E982
Person / Time
Site: Dow Chemical Company
Issue date: 11/08/1979
From: Gill H, Langner R
DOW CHEMICAL CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19210E979 List:
References
NUDOCS 7912130350
Download: ML19210E982 (1)


Text

Y Q DOW CHEMICAL U.S.A.

November 8, 1979 Mics cas Division MIDLAND, MICHIGAN 48640 United States Nuclear Regulatory Commission Region III Attention: A. B. Davis, Chief Fuel Facility and Materials Safety Branch 799 Roosevelt Road Glen Ellyn, Illinois 60137 Dow Chemical U.S.A. - TRIGA Reactor Docket No. 50-264 The inspection conducted by J. W. Hiatt on October 2, and 3, 1979, revealed that our Reactor Operations Committee failed to meet during the second quarter of 1979. Technical Speci-fication I.4 requires that the committee will meet at least quarterly.

In response to this inspection, the following corrective ac-tions have been taken:

1. The Reactor Operations Committee met March 13, August 2, October 11, and November 7 of 1979 and a meeting is scheduled for December 11, 1979.

Thus there will be five meetings in 1979 even though three of the meetings were in the fourth quarter.

2. A reminder board is being established to visibly remind committee members when meetings are due so the required meetings will be scheduled.

We feel these actions taken achieve full compliance with tech-nical specification I.4 and prevent similar noncompliance in the future.

The above proposal is submitted for your approval in meeting the requirements of 10 CFR, Part 2, 2.201.

/S'ncerel R.

/ fe ~- -

ngner,ldhairman . H. Gill 1551 156 Radiation Safety Committee Research Manager 1603 Bldg. Analytical Laboratories (517)-636-4344 1602 Bldg.

(517)-636-6485 c1j . g AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY NOV 131979 79ul30 35 0