%m EDISDN Rowo P. Cnoust Docket No. 50-346 vp t% s4w License No. NPF-3; M ' 'P"""# '
Serial No. 1-102 November 5, 1979 Mr. G. Fiorelli, Chief Reactor Construction & Engineering Support Branch Of fice of Inspection & Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Fiorelli:
On September 7, 1979 in a meeting with Region III and NRC OISE headquarters personnel, Toledo Edison committed to submit a report on primary coolant system pipe whip restraint design verification for the Davis-Besse Nuclear Power Station Unit 1 (reference OI&E Inspection Report No. 50-346/79-23). The report was to be submitted to Region III by November 9, 1979.
On November 2, 1979 our Mr. E. C. Novak contacted your Mr. E. L. Jordan to apprise Mr. Jordan that the necessary background information from the Babcock & Wilcox Company was being delayed until November 21, 1979 due to their current work load. As a result, our final report submittal would be delayed until December 7,1979.
Mr. Jordan acknowledged the delay and requested that we notify you of this change.
~
Thank you for this consideration.
Yours very truly, ffh : W 1550 Iir-D RCP:ECN mj n/2 NOV 9 1978 cc:
E. L. Jordan THE TOLEOO EOISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 h