Responds to IE Bulletin 79-18.Eleven Areas Were Found W/O Adequate Audio or Visual Alarm Capabilities.Areas Will Be re-evaluated Following Installation of Addl Alert Devices
ML19210E912
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/17/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-18, NUDOCS 7912130200
Download: ML19210E912 (3)


Text

e., .,

Ib POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FtrzPATRICK N UCLE AR POWER PLANT JOHN D. LEONARD, JR.

Resident Manager S October 17, 1979 P.O. BOX 41 Lycommg, New York 13093 315 342 384o JAFP-79 -566 4

Mr. Boyce H. Grier, Director United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

NRC I 6 E BULLETIN 79-18 AUDIBILITY PROBLEMS ENCOUNTERED ON EVACUATION OF PERSONNEL FROM HIGH-NOISE AREAS

Dear Mr. Grier:

The following provides the response of the James A. FitzPatrick Nuclear Power Plant Staff to the request for additional information contained in I 6 E Bulletin 79-13.

The responses are enumerated in the same order as the questions or required actions set forth in the request for additional information.

RESPONSE 1

1. The review specified in item 1 has been completed. Evaluation of the plant areas resulted in identification of 11 areas as having inadequate audible or visual alarm capabilities. This evaluation was performed during full power operation which is considered the condition of maximum anticipated noise level.

RESPONSE .

1. Areas identified as inaudible areas will be evaluated to determine what type of additional device or devices will be required to insure that adequate audible or visual alarms are provided.
2. Following the installation of additional visual or audible devices the areas will be reevaluated. If it is determined that an area continues to be inadequately equipped with visual or audible alarm devices, the system will be reengineered and either additional devices will be installed or administrative measures such as requir-ing an inspection of the area in the event of an emergency will be implemented. If the later is required, the site emergency plan will be revised to include instructions for implementation.

1550 098 200 (D 79u1so

Page 2 RESPONSE 3 As a result of the evaluation conducted as outlined in response one (1) above, the following areas were found to be inadequate with regard to clearly discernable evacuation signals. These areas are as follows:

1. Location Battery charge room (125 VDC)

Corrective Action Additional speaker (s) installation

2. Location Fan rooms in east and west electrical bays Corrective Action Additional speaker (s) installation 3 Location Feedwater booster pump bay 252'el, turbine building north.

Corrective Action Installation of visual alarm

  • 4. Location Each feedwater heater bay (6), turbine building EL 252 A and B EL 272 A and B EL 292 A and B Corrective Action Additional speaker (s) installation in each heater bay
  • S. Location Turbine building EL 272 condenser bay (recombiver area)

Corrective Action '

Additional speaker (s) installation

  • 6. Location Turbine building EL 250 west water box area Corrective Action Additional speaker (s) installation
  • 7. Location Turbine building EL 250, east water box area Corrective Action Additional speaker (s) installation
  • 8. Location North end of steam tunnel (turbine building)

Corrective Action Additional speaker (s) installation 1550 099

Page 4

9. Location Turbine building EL 252, condenser air removal pump area Corrective Action Additional speaker (s) installation 10 Location East cable tunnel (south end)

Corrective Action Additional speaker (s) installation

11. Location West cable tunnel (south end)

Corrective Action Additional speaker (s) installation

12. Location East end of cable tunnel (shower drain tank area)

Corrective Action Additional speaker (s) installation

  • 13. Location Torus containment are'
  • Designates those areas which are inaccessible during plant operation.

RESPONSE 4

1. The corrective actions determined per item (2) for those areas which are accessible during plant operation will be completed within 120 days from the date of this report. (Refer to the Power Authority's response of September 7,1979 (JAFP-79-468) for our request to postpone the evaluation because of plant shutdown.) The areas which are considered inaccessible due to high radiation during plant operation (and are entered infrequently for short periods of time), will be completed during the next refueling outage.

.Very,truly yours, -,

Qf $

JDL:EAM:j lk CC: G. T. Berry