ML19210E713

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 790924-28
ML19210E713
Person / Time
Issue date: 10/19/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19210E710 List:
References
REF-QA-99900105 99900105-79-1, NUDOCS 7912110120
Download: ML19210E713 (1)


Text

Fisher Controls Company Docket No.

99900105/79-01 NOTICE OF DEVIATION Based on the results of an NRC inspection conducted on September 24-28, 1979, it appears that certain of your activities were not conducted in accordance with NRC requirements as indicated below:

Criterion V of Appendix B to 10 CFR 50 states:

" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

Instructions, prc,cedures, or drawings shall include appropriate quantitative or qualitative acceptance cri-teria for determining that important activities have been satisfactorily accom-plished."

The Fisher Control Company (FCC) procedure number 5E3.10 with Amendment number AM-23, for hardfacing P8 materials with multilayer of Alloy //6 materials specifies that the preheat temperature shall be 1200 F 100 F.

Contrary to the above, it was observed that the specified preheat temperature was not achieved or maintained during the hardfacing of valve seat ring, S.O. RD281.4, using procedure SE3.IS, Amendment AM-23. Preheat temperatures were observed to fluctuate between 900 and 1100 F during this operation.

1533 073 7912,110

/2d