ML19210E632

From kanterella
Jump to navigation Jump to search
Forwards LER 79-119/03L-0
Date released: 08/12/2019 Download: ML19210E632


LER 79-119/03L-0:on 791113,during Surveillance Procedure HPN-2-3504,average Power Range Monitor F Inoperable W/Nine Low Power Range Monitor Inputs.Caused by Setpoint Drift. Calibr Performed
ML19210E635
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/28/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210E635 (1)
Forwards LER 79-119/03L-0
ML19210E631
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/28/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210E631 (1)