ML19210E518
| ML19210E518 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/30/1979 |
| From: | Kelly R GEORGIA POWER CO. |
| To: | NRC COMMISSION (OCM) |
| Shared Package | |
| ML19210E519 | List: |
| References | |
| NUDOCS 7912050150 | |
| Download: ML19210E518 (2) | |
Text
Georg.a Power Company 230 Peachtree Street 4
Post Office Box 4545 Atlanta. Georgia 30302 Telephone 404 522-6060 Georgia Power ce Pre dent and General Manager November 30, 1979 Power Generation g,
g,.uimrc m'ern Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321 AND 50-366 OPERATING LICENSES DPR-57 AND NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 SPENT FUEL POOL STORAGE EXPANSION Gentlemen:
Georgia Power Company hereby submits Amendment 4 to the report entitled " Spent Fuel Pool Modification" which was included as part of our July 9, 1979, application for expansion of the spent fuel storage capacity at Plant Hatch Units 1 and 2.
This amendment has been prepared in response to the additional information requested by your staff during the technical discussion period at the site visit on November 1, 1979.
We are continuing our evaluation regarding fuel impact loads and fuel pool structural loads. The results will be provided on the schedules discussed in the report.
Very truly yours, R. J. Kelly TMM/ JAB /mb Enclosure Swor to and subscr bed befo me this 30th day of November, 1979.
D J
Notary Public Notary. ublic, Georgia. State at Large xc: Ruble A. Thomas George F. Trowbridge, Esquire R. F. Rogers, III 1498 118 7 912 050 /fC P