Notifies of Delay in Responding to Request Re ASTM E-119 Test Procedure.New Drawings & room-by-room Documentation to Reflect Fire Safety Actions Underway.Revised Submittals Will Be Completed by 791221
ML19210E389
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/29/1979
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7912040463
Download: ML19210E389 (1)


Text

BALTIM ORE GAS AN D ELECTRIC COM PANY GAS AN D ELECTRIC B UILDING BALTIMOR E, M ARYLAN D 21203 Ammum E. LuNovm,JR. November 29, 1979 VICE PRES DE 887 som, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. Rcbert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

Subject:

Calvert Cliffs Nuclear Power Plant Units No. 1 & 2, Docket No. 50-317 & 50-318 Fire Protaction Safety Evaluation Report and Amendments to Facility Operating License File: 013-261-0, L-037-F

Reference:

1) NRC letter dated September 14, 1979 from Reid to Lundvall, same subject
2) BC&E letter dated November 13, 1979 from Lundvall to Reid, same subject Centlemen:

The referenced Baltimore Gas and Electric Company letter dated November 13, 1979 advised that we would furnish later under separate cover responses to items 3.1.19, 3.1.20, 3.2.1, 3.2.2, 3.2.8, and 3.2.9. We had anticipated that this information would be forwarded in November. On November 14, 1979, we met with your staff to discuss our proposed ASTM E-119 test procedure to qualify asbestos braid jacketed, silicone rubber insulated cable for use in safe shutdown systems without further modification. However, by telephone notification on November 20, your Mr. E. L. Conner, Jr. advised that our modified procedure for fire testing conduit having silicone rubber insulated wires would probably not satisfy the concerns of the NRC Fire Pro-tection Staff.

This has necessitated a major revision to our Fire llazards Analysis and documentation.that we had essentially completed. We are now in the process of preparing new drawings and room-by-room documentation to reflect wrapping and other alternative actions to support our Fire llazards Analysis. We antici-pate we will now furnish the revised submittals by December 21, 1979.

Very truly yours, [

~'

z .kwf &e :til /,

s cc: J. A. Biddison, Esquire G. F. Trowbridge, Esquire Messrs. E. L. Conner, Jr. - NRC 1475 170 J. W. Brothers - Bechtel 7 912 0 *u Ef(>3 o

I