ML19210E374

From kanterella
Jump to navigation Jump to search
Forwards LER 79-035/03L-0
Date released: 08/12/2019 Download: ML19210E374


LER 79-035/03L-0:on 791102,reactor Protection Sys,Channel a High Power Level Min Trip Setpoint Exceeded Tech Spec Limit. Caused by Instrument Drift.Setpoint Potentiometer Was Readjusted & Min High Power Trip Setpoint Restored to Spec
ML19210E376
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/28/1979
From: Bates R
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19210E376 (1)
Forwards LER 79-035/03L-0
ML19210E373
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/28/1979
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19210E373 (1)