ML19210E342

From kanterella
Jump to navigation Jump to search
Forwards Electrical Schematic Drawings 6I721-2095-17 & 18,in Response to N Treehan Questions Re Wiring for MSIV Loop Control Sys.Drawings Available in Central Files Only
ML19210E342
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/26/1979
From: Schuerman L
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
Shared Package
ML19210E343 List:
References
NUDOCS 7912040364
Download: ML19210E342 (1)


Text

4 November 26, 1979 TO:

L. L. Kintner United States Nuclear Regulatory Comission Office of Nuclear Reactor Regulation 7920 Norfolk Avenue Bethesda, Maryland 20014 FROM:

L.

E. Schuerman Licensing Engineer

REFERENCE:

Enrico Fermi Atomic Power Plant Unit 2 NRC Docket No. 50-341

SUBJECT:

MSIV-LCS Attached are copies of the electrical setematic diagrams (6I721-2095-17 and 18) which should answer the questions raised by Nareen Treehan on how the wiring for the MSIV-LCS meets the G.E. requirements, specifically notes 3 and 4 on our drawing 61721-2095-10.

LES:j1 Att.

cc:

W. F. Colbert E. Lusis L. F. Wooden

)f Bolo

?/t w,o n 7912040 3h

~