Text
'Af M
si2) o e-sooo
==-
ee November 27, 1979 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:
A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors 9ashington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 License No. DPR-66 Dropped Rod Event Questions Gentlemen:
This letter documents a verbal report to Mr. D. L. Wigginton (NRC) by H. P. Williams (Duquesne Light Company) of the completed actions at the Beaver Valley Power Station, Unit 1 in response to the Rod Drop Analysis problems reported by Westinghouse and discussed at a joint meeting on November 19, 1979. The following interim restrictions have been included in procedure revisions and have been reviewed by the operators.
1.
With Rod Control in Manual mode - no change.
2.
With Rod Control in Automatic and reactor power < 90% - no change.
3.
With Rod Control in Automatic and reactor power > 90% - the "D" bank control rods must be greater than 215 steps withdrawn and all other rods fully withdrawn.
These actions were completed by 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on November 22, 1979, and the restrictions will remain in effect until the problem has been resolved by additional analyses and/or plant modifications.
If you have any questions regarding our intended actions, please contact my office.
Very truly yours, C. N. Dunn Vice President, Operations cc:
D. L. Wigginton, Project Manager United States Nuclear Regulatory Commission 470 360
@\\
Operating Reactors Branch #1 t\\o Division of Operating Reactors Washington, DC 20555 9'2040 2 6