ML19210E261
| ML19210E261 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/29/1979 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19210E262 | List: |
| References | |
| 1-119-18, NUDOCS 7912040191 | |
| Download: ML19210E261 (1) | |
Text
,
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501) 371-4000 November 29, 1979 1-119-18 Mr. K. V.
Seyfrit, Director Office of Inspection and Enforcement U.S. fluclear Regula t?ry Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Startup Report - Cycle 4 (File:
0520.2)
Gentlemen:
Attached are revised pages for the subject raport which we submitted to you September 25, 1979.
This revision will correct an error in the reported roderator coefficient extrapolated to 95% full power and will shovi the loca-tions of the in-core instrumentation used to determine core power distributions.
Very truly yours,
.wa e. %R David C. Trimble Manager, Licensing DCT: ERG:pw cc:
Mr. Norman M. Haller, Director Office of Management & Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C.
20555 fir. R. W. Reid, Chief Operating Reactor Branch #4 U.S. Nuclear Regulatory Comission
}4()8
'bb Washington, D. C.
20555 7912040 lif.
lO MEMPE A M COLE SOUTH UTILITIES SYSTEM