ML19210E261

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to Startup Rept Cycle 4 Submitted on 790925
ML19210E261
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/29/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19210E262 List:
References
1-119-18, NUDOCS 7912040191
Download: ML19210E261 (1)


Text

,

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501) 371-4000 November 29, 1979 1-119-18 Mr. K. V.

Seyfrit, Director Office of Inspection and Enforcement U.S. fluclear Regula t?ry Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Startup Report - Cycle 4 (File:

0520.2)

Gentlemen:

Attached are revised pages for the subject raport which we submitted to you September 25, 1979.

This revision will correct an error in the reported roderator coefficient extrapolated to 95% full power and will shovi the loca-tions of the in-core instrumentation used to determine core power distributions.

Very truly yours,

.wa e. %R David C. Trimble Manager, Licensing DCT: ERG:pw cc:

Mr. Norman M. Haller, Director Office of Management & Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C.

20555 fir. R. W. Reid, Chief Operating Reactor Branch #4 U.S. Nuclear Regulatory Comission

}4()8

'bb Washington, D. C.

20555 7912040 lif.

lO MEMPE A M COLE SOUTH UTILITIES SYSTEM